My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012314
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
0
>
2900 - Site Mitigation Program
>
PR0506239
>
ARCHIVED REPORTS_XR0012314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:35 PM
Creation date
3/30/2020 5:01:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012314
RECORD_ID
PR0506239
PE
2950
FACILITY_ID
FA0007296
FACILITY_NAME
CITY OF ESCALON
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
HWY 120
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> , ��� 1 ice♦ <br /> CITY OF ESCALON � , <br /> 1854 Main Street <br /> Escalon, California 95320 <br /> RIGHT OF ENTRY AGREEMENT <br /> McHenry Avenue-Escalon Bellota Road/Highway 120 <br /> ' Widening/Realignment Project <br /> Property Owner John Bourdon <br /> ' Property Address 1405 Main Street <br /> San Joaquin County APN 227-062-04 <br /> ' Permission is hereby granted to the City of Escalon, its consultants, representatives, and/or agents, <br /> together with their personnel and equipment, to enter onto the above-referenced real property for the <br /> purposes of conducting a limited subsurface investigation to acouire adequate data and information to <br /> determine if the subject property is free from contaminants of concern <br /> Activities to be performed on the property include, and are generally limited to, the boring of one or <br /> more test wells, sampling and testing of soils, sampling and testing of groundwater, and a general <br /> observation of activities conducted at the site <br /> IT IS UNDERSTOOD AND AGREED <br /> I The area of work will be left in an orderly condition upon completion of the work, and any <br /> existing improvements that may be disturbed or removed during the course of the work will be <br /> replaced in kind <br /> ' Any drilling residue, be it soils or liquid,will be contained and/or covered and removed within <br /> ten (10)working days after completion of the work These materials will be deposited to an area <br /> that will not cause disruption to the normal activities conducted at the site <br /> 2 That permission to do the work and perform the acts stated herein shall remain in full force and <br /> effect until the completion of said sampling, testing, and removal of drilling residues, and that all <br /> rights granted hereunder shall cease when said work has been completed <br /> 3 The City of Escalon agrees to hold harmless the property owner for damages for any bodily <br /> ' injury to any person or damage to property caused by the herein-descnbed work on the subject <br /> property <br /> ;PROPEIT� O R CITY OF ESCALON <br /> ' DATE S- TITLE City Manager <br /> DATE <br /> mLs I%\k luscrslhennclwinlwcO3 l2\cntryagr doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.