Laserfiche WebLink
FevineeFricke-Recon <br /> ENGINEERS,HYDROGEOLOGISTS&APPLIED SCIENTISTS <br /> of groundwater sampling. We will notify you 48 hours before the installation of each boring to <br /> schedule a grout inspection, if necessary. <br /> Thank you for your cooperation. If you have any questions or comments, please call Chris Alger <br /> or me at (510) 652-4500. <br /> Sincerely, <br /> (�At n' 4�r <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachment <br /> CPTPERM.LTR:SRL 2 <br />