Laserfiche WebLink
E <br /> m , <br /> a <br /> U ° N ° Q @ 0 y <br /> a `LL a rw <br /> 1oz7 <br /> 1029 <br /> 1= <br /> c <br /> 1026 1015 In' <br /> 0' <br /> 1025 1016 . 1005 ' <br /> O 1026 1015 —•• •_ <br /> C loos <br /> 1016 <br /> LVMD <br /> 1017 e� <br /> ` 1016 PT 6503 <br /> ,• C <br /> 5��-0 •� M Proposed piezometer location <br /> Pilot boring <br /> • —� Direction for placement of alternate CPT <br /> ❑ boring,PIPP sample boring,and A-zone <br /> LVMD#4 monitoring well(pending results from initial <br /> �\ •,,.•' proposed boring location) <br /> Location number as indicated on Table 1, <br /> 'Anticipated Access/Permit Process,Lincoln <br /> C� Center,Stockton,California'. <br /> i <br /> i <br /> Lincoln Properties,LTD.property <br /> P <br /> i _ I Payless Property <br /> o _ _ <br /> E <br /> Z /if •• •• San Joaquin County Line <br /> y�'Y1 al <br /> Note: <br /> Boring and well locations are approximate <br /> pending verification of access. <br /> LINCOLN CENTER, STOCKTON, CALIFORNIA <br /> PROPOSED ACCESSFLOCATIONS OF SOIL-VAPOR <br /> SAMPLING POINTS, CPT BORINGS, PIPP SAMPLE <br /> o 125 250 FEET BORINGS, PILOT BORINGS, AND PERIMETER <br /> a <br /> MONITORING WELLS <br /> s <br /> 'R Base Map Source: Environmental Project Control Project No. 3966 L E V I N E•F R I C KE <br /> "I ENGINEERS.NVDROGEOLOGS-S 3 APPLIED SCIeWISTS <br /> I — <br />