My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1987-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:01:00 PM
Creation date
3/31/2020 2:27:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1987-1992
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40MEMORANDUM 40 <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD - CENTRAL VALLEY REGION <br /> 3443 Routier Road Phone: (916) 361-5600 <br /> Sacramento, CA 95827-3098 ATSS Phone: 8-495-5600 <br /> TO: Antonia K. J. Vorster, Senior Engineer FROM: David Brent, Project Engineer <br /> DATE: 19 July 1989 SIGNATURE: <br /> SUBJECT: LINCOLN VILLAGE CENTER, PHASE II WORKPLAN, SAN JOAQUIN COUNTY <br /> I have reviewed the subject workplan, prepared by Leedshill-Herkenhoff, Inc. , for Lincoln <br /> Properties, Ltd. , owners of Lincoln Village Center. The workplan appears sufficient to meet <br /> its stated objectives of 1) defining the on-site, lateral extent of PCE ground water <br /> contamination; and 2) to further examine the suspected soil contamination around the on-site <br /> sewer lines. Additional investigative and/or mitigative work will be determined based on <br /> the results of the Phase II work. <br /> Phase II work will consist of a soil vapor survey, follow-up confirmation soil sampling, and <br /> the installation and sampling of three additional monitoring wells. The extent of the on- <br /> site soil vapor survey is not defined but, it is assumed that it will continue until the <br /> consultant is convinced that they have defined the extent of the on-site soil contamination. <br /> There is no objections at this point to the workplan's proposal that the survey will be <br /> limited to Lincoln Village Center property only. However, Lincoln Properties, Ltd. , should <br /> be aware that it may be necessary to go off-site in the future. Off-site work is a definite <br /> possibility because the sewer laterals traversing the Lincoln Village Center flow to the main <br /> sewer line west of the site, in the residential area. <br /> Two minor clarifications are needed regarding the monitoring well construction and <br /> installation. Boring log intervals must be specified. We would prefer continuous borings <br /> but, at a minimum, borings should be logged at five foot intervals and changes in lithology. <br /> Secondly, the thickness of the bentonite seal is not mentioned or shown in the report. Both <br /> of these concerns should be clarified prior to constructing the wells. <br /> DLB <br />
The URL can be used to link to this page
Your browser does not support the video tag.