Laserfiche WebLink
LEVINE • FRICKE <br /> ENGINEERS,HVDROGEOLOGISTS&APPLIED SCIENTISTS <br /> May , <br /> Levine- is revising the <br /> Ma 31 1996 draft RI/FS Work Plan in response to comments <br /> • <br /> received from the SJC PHS/EHD and LPL. (The final RI/FS Work Plan is scheduled to be <br /> issued by September 23, 1996. A draft of the proposed revisions to the RI/FS Work Plan will <br /> be submitted to the RWQCB and the SJC PHS/EHD for review and comment on September 3, <br /> 1996.) <br /> Levine-Fricke began to prepare the draft Community Relations Plan (CRP), as discussed in <br /> Appendix D of the RI/FS Work Plan. (The final CRP will be issued when the final RI/FS <br /> Work Plan is issued.) <br /> Levine•Fricke began to revise the list of potential applicable or relevant and appropriate <br /> requirements (ARARs) and "to be considered" (TBC) criteria, as discussed in Section 5.3.1.2 <br /> of the RI/FS Work Plan. (The revised list of potential ARARs and TBC criteria will be issued <br /> when the final RI/FS Work Plan is issued. As noted in Section 5.3.1.2 of the RI/FS Work <br /> Plan, the list will continue to be reviewed and updated throughout the implementation of the <br /> RI/FS Work Plan.) <br /> Levine-Fricke contacted public agencies to identify specific permits, approvals, licenses, and <br /> right-of-entry that will be required to perform the RI, per Appendix A of the RI/FS Work Plan. <br /> Levine-Fricke began the design of the storage and operations compound (SOC). (The primary <br /> purposes of the SOC are to provide an area at LC for decontamination of field equipment and <br /> temporary storage of waste generated during field activities. SOC construction will begin when <br /> the SOC design is completed, when proper permits are obtained, and when the lease agreement <br /> between the SDCDs and LPL is finalized. The final SOC design will be provided to the <br /> RWQCB and SJC PHS/EHD by September 6, 1996.) <br /> The next bimonthly letter report will be issued in October 1996. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, / <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachment <br /> cc: Distribution List <br /> 3 <br /> 3966-G30.BMM:Sd <br />