My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LETTER OF TRANSMITTAL <br /> March 27, 1997 4111.15-004 <br /> Mary Meays, REHS <br /> San Joaquin County Public Health Services, Environmental Health Division <br /> Re: Well Permit Application for A-Zone Monitoring Well @ Lincoln School <br /> The following item is enclosed. <br /> fAcheck <br /> ription No. of Copies <br /> ed Well Permit Application for Lincoln School 1 ea <br /> for$89 1 eapy of Workman's Compensation for Gregg Drilling I ea <br /> Copy of C-57 License for Gregg Drilling 1 ea <br /> Letter from Gregg Drilling authorizing LFR to sign the well permit on Gregg's behalf 1 ea <br /> Authorization from Lincoln Unified School District to install wells at Lincoln Elementary 1 ea <br /> School <br /> The item(s) are transmitted: At your request x For your action <br /> For your review/comment For your files <br /> For your approval For your information <br /> Comments: <br /> Mary - The A-zone well will be installed following the B-zone well installation at Lincoln School. <br /> We have not yet scheduled this work. We will contact you 48 hours before field work begins to <br /> schedule your inspection. Thank you for your assistance with this matter. <br /> Sincerely, <br /> az L. Raker, enior Hydrogeologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.