Laserfiche WebLink
� �vine•Fricke•Recon <br /> ENGINEERS,HVDROGEDLOGISTS&APPLIED SCIENTISTS <br /> • The Mobile Laboratory Instrument Calibration section (Section 6.4) references Attachment C-3 <br /> instead of discussing the specific procedures. <br /> • Chain-of-Custody report completion has been removed from the On-Site Chemist <br /> responsibilities list (Section 7.1.2). <br /> • Specific references to EPA analytical methods have been replaced by specific references to <br /> target analytes (Section 7.4.3). <br /> • Soil-vapor sample holding time reference has been changed from 4 hours to 30 minutes <br /> (Section 8.3). <br /> The attached Revision No. 1 of the FSP supersedes Appendix B in the RI/FS Work Plan. Please <br /> remove Appendix B from your copy of the RI/FS Work Plan. <br /> The attached Revision No. 2 to the QAPP supersedes the Table of Contents and Sections 1 through <br /> 12 of Revision No. 1 to the QAPP, previously sent to you on February 21, 1997. Please remove <br /> the Table of Contents and Sections 1 through 12 of Revision No. 1 to the QAPP and replace them <br /> with the attached pages. Please add Attachment C-3 to the back of your QAPP binder, behind <br /> Attachment C-2. <br /> In addition to submitting the above documents to the parties identified on the attached Distribution <br /> List, the subject documents are also available for public review at the following location: <br /> Stockton Public Library <br /> Margaret Troke Branch <br /> 502 Benjamin Holt Drive <br /> Stockton, California 95207 <br /> Please contact me if you have any questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Enclosures <br /> cc: Distribution List <br /> LCQAPRV2.LTR:SRL 2 <br />