My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Levine•Fricke•Recon <br /> ENGINEERS,HVDROGEOLOGISTS&APPLIED SCIENTISTS <br /> located north of Lincoln Center. Results of the CPT and PIPP borings were used to evaluate <br /> the subsurface lithology and the nature and extent of Hazardous Substances in the A-zone <br /> aquifer in the vicinity of the proposed Phase I IRA, and to assist in the design of the planned <br /> Phase I A-zone aquifer test. <br /> • Representatives from LFR and Farr Associates, on behalf of LPL, met with the Regional <br /> Water Quality Control Board (RWQCB) on January 31, 1997 to present recommendations for <br /> conducting the Phase I IRA A-zone aquifer test. <br /> Document Submittals <br /> The following documents were completed and issued during the bimonthly period: <br /> • The Existing Monitoring Well Integrity Assessment was submitted to all parties on <br /> December 20, 1996. <br /> • Fact Sheet Number 2 was issued to all parties and residents in the vicinity of Lincoln Center on <br /> January 31, 1997. Fact Sheet Number 2 described upcoming RI and IRA field activities at <br /> the Site. <br /> • A Project Status report was submitted to the RWQCB and San Joaquin County Public Health <br /> Services, Environmental Health Division on December 20, 1996. The report described <br /> modifications to the Phase I IRA scoping activities. <br /> • The Phase I Interim Remedial Action Field Scoping Activities Interim Report was issued to the <br /> RWQCB on January 23, 1997. The report summarized the results of the Phase I IRA scoping <br /> activities conducted to date and made recommendations for the proposed Phase I IRA A-zone <br /> aquifer test. <br /> The next bimonthly letter report will be issued in April 1997. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachment <br /> cc: Distribution List <br /> 3966-F97.BMM:SRL 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.