Laserfiche WebLink
Levine.Fricke-Recon <br /> ENGINEERS,HYDROGEOLOGISTS&APPLIED SCIENTISTS <br /> All new remedial investigation and IRA monitoring wells, extraction wells, piezometers, SVE <br /> monitoring wells, SVE wells, CPT/PIPP borings, soil borings, and soil-vapor points were <br /> surveyed on October 14. <br /> • Newly installed A- and B-zone monitoring wells were developed and sampled from October 19 <br /> through 23. <br /> Phase I IRA piezometers PZ-012A (1 and 2) through PZ-014A (1 and 2), located on Pacific <br /> Avenue, were developed and sampled on October 22 and 23. <br /> Dedicated purge pump equipment will be installed in A- and B-zone monitoring wells from <br /> November 9 through 12. <br /> Documents Submitted or Received <br /> The following documents were completed and issued during the bimonthly period: <br /> The RWQCB approved the First Quarter 1998 groundwater monitoring report in its letter <br /> dated August 5, 1998. <br /> The RWQCB approved draft revisions to the Field Sampling Plan (FSP), Quality Assurance <br /> Project Plan (QAPP), and the Health and Safety Plan (HSP), Appendices B, C, and F, <br /> respectively, to the "Work Plan for Environmental Investigation, Lincoln Center, Stockton, <br /> California" ("the RI/FS Work Plan"), submitted on the May 22, 1998, in its letter dated <br /> August 5, 1998. Changes included revised sampling and updated laboratory procedures for the <br /> FSP (Appendix B; revision 4) and the QAPP (Appendix C; revision 5), and additional <br /> construction safety measures for the HSP (Appendix F; revision 1). Revisions to the QAPP <br /> and HSP (dated August 21, 1998) were issued on September 4, 1998. Final revisions to the <br /> FSP were not issued, pending review of further changes. <br /> The RWQCB approved the draft, revised "Quarterly Monitoring Plan, Lincoln Center, <br /> Stockton, California," submitted on May 22, 1998, in its letter dated August 5, 1998. <br /> The RWQCB approved the proposed additional Plume Perimeter Investigation field activities <br /> (Locations 12 through 16), submitted on June 4, 1998, in its letter dated August 5, 1998. <br /> The "Quarterly Groundwater Monitoring Report, April 1 through June 30, 1998 (Second <br /> Quarter 1998), Lincoln Center, Stockton, California," was issued on August 14, 1998. <br /> The RWQCB approved the draft "Phase II IRA Soil-Vapor Extraction Pilot Test Work Plan, <br /> Lincoln Center, Stockton, California," submitted on July 30, 1998, in its letter dated August <br /> 18, 1998. <br /> bimonthly-Oct98-0411 I SRL 3 <br />