Levine-Fricke-Recon <br /> ENGINEERS,HVDROGEOLOGISTS&APPLIED SCIENTISTS <br /> A- and B-zone monitoring wells MW-112A through MW-114A and MW-206B through <br /> MW-208B were installed at downgradient locations on Inglewood Avenue from August 3 <br /> through 21, as part of Plume Perimeter Investigation (Locations 8, 9, and 10 on Figure 1). <br /> A-zone monitoring well MW-109A was installed in south Lincoln Center on September 1, as <br /> part of the Source Area Investigation (Figure 1). <br /> Phase I Interim Remedial Action (IRA) piezometers PZ-012A (1 and 2) through PZ-014A <br /> (1 and 2) were installed on Pacific Avenue on August 12 through 16. PZ-005A-2 was <br /> overdrilled and reinstalled on August 28. <br /> Phase I IRA conveyance pipeline installation and treatment unit construction was ongoing <br /> during the bimonthly period. Construction will be completed in November. <br /> Phase II IRA soil vapor extraction (SVE) monitoring wells and extraction wells were installed <br /> at Lincoln Center from September 28 through October 9. <br /> • Shallow and deep soil-vapor samples were collected from borings SV-647 to SVE-649 near the <br /> intersection of West Benjamin Holt Drive and Gettysburg Place on August 5 and 6, as part of <br /> the Source Area Investigation (Figure 1). (Analytical results were forwarded to the RWQCB <br /> and LPL.) <br /> • Access negotiations continued with private property owners and their tenants for permission to <br /> conduct remedial investigation activities on nearby properties. <br /> Data Collection and Field Activities Anticipated for October and November 1998 <br /> The following data collection and field activities are planned at the Site during the next bimonthly <br /> period or have commenced or been completed since the end of the bimonthly period: <br /> Phase I IRA startup activities began in October. Three phases of groundwater extraction, <br /> treatment, and disposal will be performed as part of the Treatment Performance and <br /> Evaluation (TPE) to be conducted pursuant to the National Pollution Discharge Elimination <br /> System and Waste Discharge Requirements (WDRs). After the final TPE report is approved <br /> by the RWQCB, the Phase I IRA groundwater extraction treatment system (GWETS) will be <br /> fully operational. The GWETS prove-out will be conducted in November and December to <br /> calibrate the groundwater flow model as described in the Phase I IRA Detailed Plan. Routine <br /> operations and maintenance will commence in December. <br /> The Phase II IRA SVE pilot test was conducted in October. The pilot test was conducted to <br /> collect data to design and implement an appropriate IRA to address significant concentrations <br /> of volatile organic compounds (VOCs) within the unsaturated zone. <br /> bimonthly-Oct9B-04I 11:SRL 2 <br />