My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
011 LFR <br /> Manual) was submitted to the RWQCB on February 12, 1999. The RWQCB approved the <br /> 0&M Manual in its letter dated March 12, 1999, on the condition that three comments were <br /> addressed. Those comments were addressed, and the Final O&M Manual was issued on <br /> March 29, 1999. <br /> • "Operation of the Remediation System, Lincoln Village Center, Stockton, San Joaquin <br /> County," regarding the shut down of the GWETS as a result of the termination of the <br /> environmental insurance policy, was issued by the RWQCB on March 29, 1999. <br /> Anticipated Future Document Submittals for April and May 1999 <br /> The following documents are planned during the next bimonthly period, or have been submitted <br /> since the end of the bimonthly period: <br /> • "Combined Groundwater Monitoring and NPDES Reports for the Quarterly Period January 1 <br /> through March 31, 1999 (WDR Order No. 98-062; NPDES No. CA0084255), Lincoln Center, <br /> Stockton, California," will be submitted to the RWQCB on May 14, 1999. <br /> • The "Final Phase II Interim Remedial Action Detailed Plan, Lincoln Center, Stockton, <br /> California," will be submitted in May 1999 for approval by the court. <br /> • Two Interim Risk Assessment documents regarding data completeness and fate and transport <br /> will be submitted in May 1999. <br /> • Construction Specifications and Bidding Documents for the Phase II Interim Remedial Actions <br /> Soil Vapor Extraction System will be submitted in May 1999. <br /> • Permit applications for field activities associated with the Phase II Interim Remedial Action <br /> will be submitted to the SIC PHS/EHD, SIC Public Works Department, and City of Stockton <br /> Public Works Department in May 1999. <br /> The next bimonthly letter report will be issued in June 1999. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, p/ <br /> Donald T. r ds aw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachments: Figure 1 <br /> cc: Distribution List <br /> bimonthly-Apr994MI I I.doc:blh 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.