Laserfiche WebLink
01LFR <br /> • The RWQCB approved the "Phase I Interim Remedial Action Treatment Plant Evaluation <br /> Report, Lincoln Center, Stockton, California," submitted on November 13, 1998, in its letter <br /> dated November 20, 1998. <br /> • Revision No. 5 to the FSP, Appendix B to the "Work Plan for Environmental Investigation, <br /> Lincoln Center, Stockton, California," dated September 23, 1996, and revised November 30, <br /> 1998, was submitted to all parties on November 30, 1998. <br /> Anticipated Future Document Submittals <br /> The following documents are planned during the next bimonthly period, or have been submitted <br /> since the end of the bimonthly period: <br /> • "Results of Additional CPT Investigation and Proposed Additional Investigation, Lincoln <br /> Center, Stockton, California," was submitted to the RWQCB on December 8, 1998. <br /> • Phase I IRA construction as-built drawings were submitted on December 18, 1998. <br /> • The Phase I IRA treatment system operations and maintenance manual will be submitted in <br /> January 1999. <br /> • The conceptual Phase II IRA Detailed Plan will be submitted in January 1999. <br /> • Permit applications for field activities, including the Source Area Investigation and Plume <br /> Perimeter Investigation, will be submitted to the SIC PHS/EHD, SJC Public Works <br /> Department, and City of Stockton Public Works Department. <br /> The next bimonthly letter report will be issued in February 1999. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachments: Figure 1 <br /> cc: Distribution List <br /> bimonthly-Dec98-04111 SRL 3 <br />