Laserfiche WebLink
Page 1 of 3 <br /> Nuel Henderson [EH] <br /> From: Orin Regier[ORegier@Geosyntec.com] <br /> Sent: Tuesday, September 15, 2015 12:21 PM <br /> To: Nuel Henderson [EH] <br /> Cc: Tim Davis; Caryn Quist; Peter Dennehy <br /> Subject: GF] MailEssentials sanitized email - LCERT Summary 9.12.2015-9.13.2015 <br /> Importance: High <br /> Attachments: SecurityReport.html <br /> Neul, <br /> Good Afternoon, <br /> The following field activities were performed on 9/12—9/13/2015 at Lincoln Center: <br /> AS-28: <br /> Tagged Depth - 57 ft bgs <br /> Total Depth Drilled—57 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 45-50 feet of casing(casing was wrapping around <br /> guide rod and some casing crushed and some lost downhole). <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 175 gallons of grout tremmied down augers. <br /> AS-11: <br /> Tagged Depth - 58 ft bgs <br /> Total Depth Drilled—59 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 58 feet of casing(all casing pulled including screen <br /> interval). <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 150 gallons of grout tremmied down augers. <br /> AS-24: <br /> Tagged Depth- 61 ft bgs <br /> Total Depth Drilled—62 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 61 feet of casing(casing was wrapped around guide <br /> rod and some of the casing was crushed, driller states that all casing was successfully removed). <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—augers sunk below grade and capped; borehole will be grouted first thing next night <br /> shift. <br /> AS-10: <br /> Tagged Depth- 58.5 ft bgs <br /> Total Depth Drilled—61 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 58 feet of casing (all casing pulled including screen <br /> interval). <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—augers sunk below grade and capped; borehole will be grouted first thing next night <br /> shift. <br /> 9/18/2015 <br />