My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:00:55 PM
Creation date
3/31/2020 2:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2008-2015
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> SVE-029: <br /> Tagged Depth—28 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 40 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Grout in casing held a pressure of 20psi for five minutes. <br /> 45 gallons of grout mix(40 gal H2O and 8 bags) poured into well vault to bring grout up to 8 inches above the <br /> top of the 4" PVC casing. <br /> SVE-028: <br /> Tagged Depth—27.5 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 70 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Grout in casing held a pressure of 20psi for five minutes. <br /> 60 gallons of grout mix(40 gal H2O and 8 bags) poured into well vault to bring grout up to 8 inches above the <br /> top of the 4" PVC casing. <br /> SVE-031: <br /> Tagged Depth—28 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 55 gallons of grout (mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Grout in casing held a pressure of 20psi for five minutes. <br /> 45 gallons of grout mix(40 gal H2O and 8 bags) poured into well vault to bring grout up to 8 inches above the <br /> top of the 4" PVC casing. <br /> SVE-032: <br /> Tagged Depth—27 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 55 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Grout in casing held a pressure of 20psi for five minutes. <br /> 55 gallons of grout mix (40 gal H2O and 8 bags) poured into well vault to bring grout up to 8 inches above the <br /> top of the 4" PVC casing. <br /> Regards, <br /> --Orin Regier <br /> 9/14/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.