Laserfiche WebLink
Page 2 At January 1997 <br /> 0 MW <br /> continued from page I The following sections briefly describe the field work that <br /> comply with the Court's orders, Levine-Fricke, now will begin soon,the equipment that will be used, and the <br /> Levine-Fricke-Recon Inc. (LFR), the Site Project Man- notifications that will be provided to residents and busi- <br /> ager designated by the SDCDs, has prepared an RDFS nesses in the area prior to performing the field work. <br /> Work Plan to perform the investigation. <br /> PROPOSED INVESTIGATIONS <br /> The RI/FS and IRA Work Plans call for performing certain parking lots located adjacent to the Site to identify and <br /> field investigations on and off the Site as discussed below. characterize the extent to which dry cleaning contamina- <br /> Prospective work locations are shown in Figure 2 of this fact tion has migrated in groundwater away from the source <br /> sheet.Additional locations may be required,depending on the areas. The Plume Perimeter Investigation tasks include <br /> results of this planned work. Appropriate permits will be collection of lithologic data,installation of groundwater <br /> obtained, where required, before performing the field work. monitoring wells,collection of groundwater samples, and <br /> performance of aquifer tests. Detailed information on the <br /> Source Investigation proposed investigation is contained in Section 3.6 of the <br /> A Source Investigation will be conducted at selected loca- RDFS Work Plan. <br /> tions within parking lots at the Site to identify and character- <br /> ize suspected or known dry cleaning contamination release The equipment used for these portions of the investigations <br /> areas along selected portions of the sanitary sewer system and for the duration of field activities will be similar to that <br /> and around the former and current dry cleaning facilities. described for the Source Investigation. <br /> The Source Investigation tasks will be conducted sequentially <br /> and include collection of lithologic data, collection of soil IRA Activities <br /> vapor,soil and groundwater samples,and installation of The IRA Activities will be conducted at the Site in two <br /> additional groundwater monitoring wells.Detailed informa- phases.Phase I will include the installation of groundwater <br /> tion on the proposed investigation is contained in Section 3.5 extraction wells near the downgradient edge of Lincoln <br /> of the RDFS Work Plan. Center and piping to convey extracted groundwater to a <br /> centralized treatment unit to be installed at the Site. <br /> Various sizes and types of field equipment will be used for <br /> this investigation.The majority of the equipment will consist Before installing these facilities,additional investigation and. <br />, of a cone penetration tqdlMPT) rig, which will be used testing activities,such as installation of additional ground- <br /> to push an instrumented pr89 to soil to obtain lithologic water monitoring wells,collection of lithologic data and <br /> data;soil drilling rigs,which will be used to drill holes in the groundwater samples using CPT equipment, and perfor- <br /> ground to obtain soil samples and install groundwater wells; a mance of aquifer pump tests, will be conducted at the <br /> soil-vapor sampling rig and mobile laboratory,which will be Site to facilitate design of the Phase I IRA.Field activities <br /> used to pound a probe into the ground,obtain a soil-vapor for the IRA are in addition to those planned for the Source <br /> sample,and analyze it for the presence of dry cleaning Investigation, although some data from the Source Investi- <br /> contamination;and a geophysical logging rig,which will be gation will be used in designing the IRAs at the Site.The <br /> used to obtain lithologic data from boring prior to well equipment used will be similar to that described for the <br /> construction. Such vehicles are typically no larger than a Source Investigation. <br /> double-axle truck. Concrete trucks, water trucks, a small e phase II will likely include installation of soil vapor extrac- <br /> forklift, and other ancillary equipment will also be used tion wells and a treatment system in areas identified during <br /> occasion.The duration field activities will vary from less the Source Investigation. Soil-vapor extraction wells will be <br /> than 1 hour to approximately ]0 days at any given location. installed in a manner similar to the groundwater monitoring <br /> wells.Detailed information on the proposed investigation is <br /> Plume Perimeter Investigation P P g <br /> A Plume Perimeter Investigation will be conducted at contained in Section 3.0 of the IRA Work Plan. <br /> selected locations in neighborhood streets and commercial <br /> SCHEDULE • • <br /> The Source Investigation and Plume Perimeter Investigation The notices will describe the location, type, and duration of <br /> will begin in late January 1997.The exact duration of these the anticipated activities. Some of the field work required at <br /> investigations will depend upon the results of the initial data the Lincoln Center shopping center will be performed <br /> collection proposed in the RDFS Work Plan, but they are during non-business hours (from approximately 10 p.m. to <br /> expected at a minimum to continue through the summer of 7 a.m.). Field work to be performed off the shopping <br /> 1997. The IRA activities are currently under way and will center will be primarily conducted during daylight hours <br /> also continue periodically throughout 1997. wherever possible. Traffic plans will be prepared for work <br /> in public rights-of-way to safely route vehicle and pedes- <br /> Notices will be provided to residents and businesses imme- trian traffic around the work areas. The SDCDs will <br /> diately adjacent to the areas where field work will be attempt to minimize noise and other potential impacts to <br /> performed before the scheduled field activity is conducted. residents and businesses. <br />