Laserfiche WebLink
Frontier Transportation, Inc. -2- August 28, 2000 <br /> Claim No. 012886 <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will review <br /> any tasks/cost that go beyond the pre-approved amount to be determined if the additional tasks and <br /> costs are necessary and reasonable. However, if costs exceed the above pre-approved amounts, the <br /> Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Blakely Environmental Investigations, Inc. proposal in my pre- <br /> approval above,please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal dated July 31, 2000 by Blakely Environmental Investigations, Inc. for <br /> conducting the work approved by the County. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary future corrective action work. If you need <br /> assistance in procuring contractor and consultant services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultant prepares their invoices to include the <br /> required breakdown of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all.• <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at(916) 227-4518. <br /> Sin erely, <br /> ennilyn Fu , Wate Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> California En vironmeota/Protection Agency <br /> Zd RecxdedPape, <br />