Laserfiche WebLink
1 <br /> 6 14 OPTION IV-Excavation With Off-Site DisposaUTreatment 16 <br /> 62 Groundwater Remediation 16 <br /> 6 2 1 OPTION I -Passive Groundwater Remediation-No Action 16 <br /> 6 2 2 OPTION II - Soil Vapor Extraction and Groundwater Pump and Treat 16 <br /> 6 2 3 OPTION III- Groundwater Pump and Treat 17 <br />' 6 2 4 OPTION IV - Well Inoculation and Low Flow Air Injection 17 <br /> 7 0 REMEDIAL SYSTEM DESIGN 17 <br />' <br /> 71 Soil Vapor Extraction 18 <br /> 7 1 1 Summary of Major Components for VES 18 <br /> 7 1 2 Well Installation Spacing 18 <br />' 7 13 Equipment Layout 19 <br /> 72 Groundwater Pump and Treat 19 <br /> 7 2 1 Well Installation Spacing 20 <br />' 7 2 2 Pump Construction and Groundwater Treatment 20 <br /> 80 SYSTEM SAMPLING AND MONITORING 21 <br />' 8 1 Quarterly Progress Reporting 21 <br /> 90 REQUIRED PERMITS 21 <br /> 100 CONFIRMATION BORINGS 22 <br /> 10 1 Waste Management Plan 22 <br /> 10 2 Health and Safety Plan 22 <br /> 110 REMARKS 22 <br /> TABLES <br /> Table 1 Well Construction Summary <br />' Table 2 Summary of Analytical Results for Soil Samples <br /> Table 3 Groundwater Analytical Results for Petroleum Hydrocarbons and Aromatic <br /> Hydrocarbons <br />' Table 4 Laboratory Analytical Results - Groundwater Extraction Well <br /> Table 5 Depth to Groundwater in Monitoring Wells -Extraction Test <br /> A11528J1 ASA 11 <br />