My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009689
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
ARCHIVED REPORTS_XR0009689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 5:15:35 PM
Creation date
3/31/2020 4:50:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009689
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plot Plan <br /> Figure 3 Groundwater Gradient Map <br />' Figure 4 Site Plot Plan Showing TPH Concentrations in Groundwater <br /> Figure 5 Site Piot Plan Showing Benzene Concentration Contours in Groundwater <br /> Figure 6 Site Piot Plan Showing MTBE Concentrations Contours in Groundwater <br />' Figure 7 Site Plot Plan Showing TPH in Soil, 10-30 feet bgs <br /> Figure 8 Site Plot Plan Showing TPH in Soil, 35-65 feet bgs <br /> Figure 9 Site Plot Plan Showing Benzene in Soil, 10-30 feet bgs <br />' Figure 10 Site Plot Plan Showing Benzene in Soil, 35-65 feet bgs <br /> Figure 11 Site Plot Plan Showing MTBE in Soil, 10-30 feet bgs <br /> Figure 12 Site Plot Plan Showing MTBE in Soil, 35-65 feet bgs <br />' Figure 13 Site Plot Plan Showing Geologic Cross Sections <br /> Figure 14 Cross Section A-A' <br /> Figure 15 Cross Section B-B' <br />' Figure 16 Site Map Showing Vapor Extraction Radius of influence <br /> Figure 17 Proposed Process and Instrumentation Diagram <br /> Figure 18 Site Map Showing Manifold Piping <br />' Figure 19 Site Map Showing Groundwater Extraction Radius of Influence <br /> Figure 20 Proposed Groundwater Extraction Process Diagram <br /> APPENDICES <br />' Appendix A Field Boring Logs and Well Construction <br /> Appendix B Laboratory Reports and Chains of Custody <br />' Appendix C Calculations for Groundwater Drawdown <br /> Appendix D Thrifty's Corrective Action Plan Submitted <br /> Appendix E Special pernut for Wastewater Discharge <br />' Appendix F Groundwater Sampling Data Sheets <br /> Appendix G Remedial Cost Feasibility Analysis <br /> 1 <br /> A.115=1 ASA <br />
The URL can be used to link to this page
Your browser does not support the video tag.