My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 July 2004 � <br /> AGE-NC Project No, 98-0540 <br /> Page 3 of 10 <br /> • Development and survey of the monitoring wells; <br /> • Collection of ground water samples; and <br /> • Preparation of a report of findings. <br /> Each of these tasks are described in more detail below. <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> A site assessment boring permit will be obtained from the EHD for the boring location.As required <br /> by EHD permitting,a Site Health and Safety Plan will be prepared in accordance with Occupational <br /> Safety and Health Guidance Manual for Hazardous Waste Site Activities (National Institute for <br /> Occupational Safety and Health Administration)and with federal(29 CFR 1910.120)and state(title <br /> 8, Cal. Code Regs., section 5192) regulations. <br /> The SHSP will include: <br /> • Field activities, standard operating procedures (SOP); personnel requirements, potential <br /> hazardous substances, personnel w/ responsibilities, chemical, physical hazards, confined <br /> spaces and climatic conditions. The risks arising from the work being performed: impact to <br /> workers, community and the environment; Exposure monitoring plan; personal protective <br /> equipment and engineering controls; Site controls including work zones and security <br /> measures/ decontamination procedures. <br /> • Overall workpractices;with sanitation facilities/plans.Emergency response plan addressing <br /> hazardous material/waste releases; personnel training requirements; personnel medical <br /> surveillance program/record keeping. Requirements that all field personnel will be trained <br /> in hazardous materials communication and will have completed a 40-hour Health and Safety <br /> Course as specified in OSHA Hazardous Waste Operations and Emergency Response <br /> Standard [29 CFR 1910.120(e)], and 8-hour annual refresher courses as necessary. <br /> • Prior to digging activities, each proposed digging location will be clearly marked and an <br /> utility clearance obtained through Underground Service Alert. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.