Laserfiche WebLink
Phase II Site Assessment Workplan/Health and Safery Plan October 1999 <br /> for the Hammer Lane/Highway 99 Interchange Improvement Project Project No. H2O2 <br /> Laboratory Analyses <br /> Since the type(s)of contamination that may be present are generally unknown at this time,type <br /> of analysis will be determined following exploration. Considering that fuels, oils, and or <br /> solvents may be encountered, analyses may include: total petroleum hydrocarbons for gas <br /> (EPA8020), total petroleum hydrocarbons for diesel and motor oils (mod. EPA8015), and <br /> halogenated hydrocarbons (EPA8010), Cam 8 metals (EPA 6010, Total Threshold Limit <br /> Concentrations). A two week sample turn-around time is standard. <br /> Anticipated Subcontractors <br /> Drilling Contractor - PC Exploration <br /> 3883 Cincinnati Avenue <br /> Rocklin, CA 95765 <br /> Laboratory - Sequoia Analytical <br /> 819 Striker Ave., Suite 8 <br /> Sacramento, CA 95834 <br /> 4 <br /> `� ESPANA GEOTECHNICAL, CONSULTING <br />