Laserfiche WebLink
7 <br /> Phase II Site Assessment Workplan/Health and Safety Plan October 1999 <br /> for the Hammer Lane/Highway 99 Interchange Improvement Project Project No. H2O2 <br /> SITE SPECIFIC HEALTH & SAFETY PLAN <br /> Hammer Lane/Highway 99 Interchange Improvement Project <br /> This form must be completed in a minimum of one (1) week prior to the start of work. It is the <br /> responsibility of the project engineer to complete all items. All project personnel must receive a <br /> copy of this form and familiarize themselves with its contents prior to the start of activities. <br /> 1. Site Name and Address: <br /> Former Mobil Oil Site <br /> 7840 North Highway 99 East Frontage Road <br /> Stockton, CA. 95212 <br /> The Auto Factory (Former Texaco Station) <br /> 5942 North Highway 99 East Frontage Road <br /> Stockton, CA. 95212 <br /> 2. Site Personnel: <br /> Project Manager Patrick Fischer <br /> g <br /> Project En ineer/Geologist Mike Wilson/Jim Frumm <br /> Driller To be determined <br /> Helper To be determined <br /> 3. Site Description and Background <br /> See Site Workplan <br /> 4. List of Potential Chemical Contaminants: <br /> Contaminant Source Medium Anticipated <br /> i Concentrations <br /> Fuel (gas/diesel) UST/Pipelines Soil/Air Unknown <br /> Waste oil Sumps/dumping Soil Unknown <br /> Solvents Sumps/dumping Soil/Air Unknown <br /> t <br /> 5 <br /> ,� ESPANA GEOTECHNICAL CONSULTING <br />