Laserfiche WebLink
f _ <br /> 1 <br /> Phase II Site Assessment Workplan/Health and Safety Plan October 1999 <br /> for the Hammer Lane/Highway 99 Interchange Improvement Project Project No. H2O2 <br /> location. Rinse water will remain on site in approved drums until characterized for appropriate <br /> disposal. <br /> 9. Special Procedures and Precautions <br /> Use of half face respirators if level of fuel/solvent vapors reaches PEL(see below). Close up <br /> excavation/boring and discontinue any further work at that location until source/approach is <br /> further defined. <br /> 10. 'Action Levels <br /> i <br /> Activi1y Location Action Level Level of Protection <br /> All Site 10 ppm TPH at 4 ft. Mod. Level D (Incl. Respirator) <br /> above ground surface or <br /> significant odor. <br /> i <br /> 12. Emergency Contacts ' <br /> Police: 911 <br /> i <br /> Fire: 911 <br /> Ambulance: 911 <br /> Hospital: 943-2000 (Saint Josephs Hospital) <br /> ' I <br /> 13. Directions to Nearest Hospital (see Figure 2, Directions to Hospital) <br /> i <br /> 1800 North California Street,Stockton. Highway 99 south to Wilson Way. Proceed southwest <br /> on Wilson Way to Harding Way. Proceed west on7Harding Way to North California Street. <br /> Proceed north on California Street to Saint Josephs Hospital. <br /> I <br /> 8 <br /> V ESPANA GEOTECHNICAL CONSULTING <br />