My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
01
SITE_LOCATION
21801 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Appendix D : Standard Operating Guideline - <br /> Groundwater Sampling <br /> 13.1 Introduction <br /> This Standard Operating Guideline (SOG) provides the procedures typically followed by <br /> Kennedy/Jenks Consultants personnel during the collection of groundwater samples from <br /> monitoring wells. Groundwater sampling from temporary boreholes (e.g., grab groundwater <br /> samples collected from direct push borings) is not addressed by this SOG. This SOG provides <br /> guidance on procedures that are generally consistent with standard practices used in environmental <br /> sampling. Federal, state and/or local regulatory agencies may require groundwater sampling <br /> procedures that differ from those described in this SOG and/or may require additional procedures. <br /> As guidance, this SOG does not constitute a specification of requirements for groundwater <br /> sampling. Deviations from, and additions to, the procedures described herein may be appropriate <br /> based on project-specific sampling objectives, site-specific conditions, and/or regulatory <br /> requirements. The user of this SOG should modify the sampling procedures used, as appropriate, <br /> to conform to the project-specific requirements and then document such deviations from this SOG <br /> in the project-specific documentation of groundwater sampling activities. <br /> This SOG does not address Quality Assurance/Quality Control (QA/QC) procedures for <br /> groundwater sampling in detail. While some general QA/QC procedures are addressed, project- <br /> specific QA/QC procedures should be developed and presented in a Quality Assurance Project <br /> Plan (QAPP), field sampling and analysis work plan, or other project- or activity-specific document. <br /> This SOG contains the following sections: <br /> • Field Equipment/Material <br /> • Typical Procedures for Monitoring Well purging and Groundwater Sampling <br /> • Stabilization Criteria for Adequacy of Monitoring Well Purging <br /> • Typical Procedures for Groundwater Sampling using Passive Diffusion Bags (PDBs) <br /> • Quality Control Guidance <br /> • Investigation-Derived Waste (IDW) Management <br /> • References <br /> D.2 Field Equipment/Materials <br /> Material/equipment typically required for the collection of groundwater samples from monitoring <br /> wells may include: <br /> • Electric water-level monitoring probe <br /> • Bladder pump, peristaltic pump, pre-cleaned, disposable, 2- or 4-inch bailers with <br /> disposable cord, inertial pump, submersible pump, passive diffusion bags or other suitable <br /> apparatus for purging the well and sampling <br /> • Flexible discharge tubing (polyethylene (PE), Teflon TM, or similar] <br /> • Purge water collection container <br /> Monitoring Well Installation Work Plan, D-1 <br /> Barrel Ten Quarter Circle Land Company, Escalon, California <br /> \\SFO\Groups\I S-Group\Admin\Job\03\030118.27_BTQCLC\09-Reports\M W-Install-W Pln\Appendi xW PP_D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.