Laserfiche WebLink
• • <br /> Kennedy/Jenks Consultants <br /> • Multi-parameter water quality meter (temperature, pH, specific conductance, redox potential) <br /> • Turbidity meter <br /> • Flow-through cell <br /> • Nitrocellulose filters (if conducting field filtering) <br /> • Sample containers (laboratory-supplied) with appropriate preservatives <br /> • Additional chemical preservatives (if necessary) <br /> • Watch or stopwatch <br /> • Sample labels, pens, field logbook, or other appropriate field forms (e.g., groundwater purge <br /> and sample forms, chain-of-custody forms), and access agreements and third-party sample <br /> receipts (if warranted) <br /> • Previous purging and sampling data for monitoring wells to be sampled, including water <br /> levels, purging parameters, and laboratory analysis results. <br /> • Monitoring well boring and construction log (including wellhead elevation survey and <br /> reference point information) <br /> • Personnel and equipment decontamination supplies <br /> • Sample shipping and packaging supplies <br /> • Personal protective equipment as specified in the Health and Safety Plan (HASP). <br /> D.3 Typical Procedures for Monitoring Well Purging and <br /> Groundwater Sampling <br /> 1. Pre-Purging Data Collection and Purging Equipment Placement. <br /> Record the data and information collected during this procedure on a groundwater purge and <br /> sample form. Perform the following prior to groundwater sampling: <br /> a. Calibrate the multi-parameter water quality meter, prior to beginning sampling and as <br /> necessary based on field conditions, in accordance with the instructions in the <br /> manufacturer's operation manual. Note that it may be appropriate to keep a written log of <br /> the calibration procedures and an instrument maintenance with the instrument. <br /> b. Examine the monitoring well to be sampled and associated protective surface enclosure for <br /> any structural damage, poorly fitting caps, and leaks into the inner casing. If notable <br /> conditions exist, they should be recorded on the sampling log for the well so that any <br /> necessary follow-up corrective actions can be planned and implemented. <br /> c. Record an initial measurement of the depth to water. Calculate the volume of water in the <br /> well casing if wetted-casing-volume-based purging is to be used to remove the so-called <br /> "stagnant water" from the well prior to sampling. The volume of water in the wetted well <br /> casing should be calculated using the formula: V = (7E r2) x L where r is one half of the inner <br /> diameter of the well casing/screen and L is the length of wetted casing/screen (calculated by <br /> subtracting the depth to water from the total well depth). Total well depth should not be <br /> measured at the start of a sampling event (due to the potential to cause turbidity). Measure <br /> the total well depth after sample collection. Note that some regulatory agencies require that <br /> Monitoring Well Installation Work Plan, D-2 <br /> Barrel Ten Quarter Circle Land Company, Escalon, California <br /> \\SFO\Groups\I S-Group W dtni n\Job\03\030118.27_BTQCLC\09-Reports\M W-Install-W Pln\Appendi xW PP_D.doc <br />