Laserfiche WebLink
Groundwater Sampling anAnalysis Plan <br /> Former Texaco Service Station <br /> Chevron Site ID 309075 <br /> January,,14, 2011 <br /> L4.4 EQUIPMENT DECONTAMINATION PROCEDURES <br /> Prior to arrival at the site, the tools and accessories will be thoroughly decontaminated. <br /> Equipment that requires decontamination prior to and between uses include: sampling devices <br /> and instruments such as pumps and sounders. As detailed in the G-R SOP, any equipment <br /> requiring decontamination will be manually scrubbed with a solution. of,potable water and <br /> Alconox, or equivalent laboratory-grade detergent. The equipment will then be rinsed with <br /> potable.water followed by a distilled water rinse. All decontamination wash/rinse water will be <br /> collected onsite and containerized for future disposal and/or treatment. <br /> L <br /> I <br /> \\CA5FP\Data\Aproject\ENV\CHEVRON\309075\6 Deliverables\Work Plan\SAP\309075_SAP_6671110950.doc 6 <br />