Laserfiche WebLink
' Work Plan—Soil Boring Installation Page 4 <br /> 461 Powers,Manteca <br /> ' Project 408 <br /> May 9, 2003 <br /> 4.0 SIGNATURES AND CERTIFICATION <br /> Geo-Phase Environmental Inc. will perform this project in accordance with accepted geologic <br /> ' and hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geo-Phase Environmental Inc. is not responsible for undisclosed conditions. <br /> ' This work plan was prepared by: <br /> Geo-Phase Environmental Inc. <br /> S e don McLeod, tEyED GE01 <br /> Geologist a� SK <br /> ' LANKFORD <br /> No.4283 <br /> fib! <br /> SOF CAI��y� <br /> ' Stephen M Lankford, <br /> Registered Geologist#4283 <br /> 1 <br /> 1 <br /> ' 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br /> 1 <br />