My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081859_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10331
>
2600 - Land Use Program
>
SR0081859_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:08 PM
Creation date
4/2/2020 2:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081859
PE
2602
STREET_NUMBER
10331
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
12203008
ENTERED_DATE
3/9/2020 12:00:00 AM
SITE_LOCATION
10331 N HWY 99 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Suitability and Nitrate Loading Study <br /> JAIMES PROPERTY <br /> 10331 North State Route 99 Frontage Road, Stockton, California <br /> TABLE OF CONTENTS <br /> 9.0. IMPACT OF NITRATE TO GROUNDWATER .................................................... 10 <br /> 9.1. CURRENT OFF-SITE SOURCES OF NITRATE ............................................. 10 <br /> 9.2. IMPACT OF RAINFALL CONTRIBUTION TO NITRATE LOAD ...................... 10 <br /> 9.3. CURRENT ON-SITE SOURCES OF NITRATE ............................................... 11 <br /> 9.4. FUTURE ON-SITE SOURCES OF NITRATE .................................................. 11 <br /> 9.5. DENITRIFICATIONS CAUSED BY SOILS....................................................... 11 <br /> 9.6. MASS BALANCE OF NITROGEN LOADING .................................................. 11 <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO <br /> DOWNGRADIENT WATER SOURCES........................................................... 13 <br /> 10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT............................... 13 <br /> 11.0. MITIGATION METHODS PROPOSED ............................................................... 13 <br /> 12.0. CONCLUSIONS AND RECOMMENDATIONS................................................... 13 <br /> 13.0. LIMITATIONS ..................................................................................................... 14 <br /> FIGURES <br /> Figure 1 — Location Map <br /> Figure 2 — Site Plan <br /> APPENDICES <br /> Appendix A— Parcel Vicinity Map/Air Photo and Information <br /> Appendix B — Onsite Well/Septic Permit <br /> Appendix C — Percolation Test Sheet/Onsite Wastewater Treatment System Permit- <br /> Percolation Test <br /> Appendix D — CIMIS Rain Evapotranspiration Report 2094-2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.