Laserfiche WebLink
California Regional Water Quality Control Board :> <br /> Central Valley Region <br /> Winston H.Hickox Steven T.Butler,Chair - x:IL::� <br /> Seeretaryfor Gray Davis <br /> Environmental Sacramento Main Office 6 Governor <br /> Protection Internet Address: http://www.swrcb.ca.9ov/-rwgcb5 d _ <br /> 3443 Routier Road,Suite A,Sacramento,California 95827-3003 .a <br /> Phone(916)255-3000•PAX(916)255-3015 C <br /> G3 <br /> N <br /> 23 August 2000 <br /> v <br /> Mr. Bob Yribarren N 7 =- <br /> San Joaquin Delta College , = <br /> 5151 Pacific Avenue ^) _ <br /> Stockton, CA 95207 <br /> SAN JOAQUIN DELTA COLLEGE, 5151 PACIFIC AVENUE, STOCKTON, SAN JOAQUIN <br /> COUNTY <br /> Thank you for meeting with Board staff on Friday, 18 August 2000, to discuss the situation regarding the <br /> petroleum contamination identified in your Robinhood Irrigation Well that is used to supply all the <br /> irrigation water for your campus. A variety of options were discussed, and in light of the newly started <br /> school year the alternative to pursue the short term use of city supplied water with the long term being <br /> the installation of a new well appears to be the best alternative at this time. <br /> Therefore, to recap what was discussed and agreed upon by all present at the 18 August meeting: <br /> 1. The Robinhood Irrigation Well will be taken out of service as of 6:00 AM on 22 August 2000, at <br /> the direction of Regional Board staff, and will not be put back into use without prior Regional <br /> Board approval. (Completed) <br /> 2. Delta College staff will research and propose alternative options for irrigation of the college in <br /> case the city water option is not able to be realized or is sufficient to replace the existing demand <br /> that was being satisfied by the Robinhood well. Options may include a mixture of activities <br /> including hand watering. (To be completed) <br /> 3. Siegfried Engineering,Delta's professional consultant, will expeditiously determine the ability <br /> to, equipment necessary for, projected time frame for implementation of, and proposed costs for <br /> connection to city water at the two existing site city water connections. Board staff have been <br /> informed that as of 22 August, one of the existing city water connections was in operation and <br /> supplying water, but is not capable of meeting the required demands by itself. Also, that a <br /> second pump was being ordered and should be on-site within a week. <br /> 4. A meeting has been scheduled for Tuesday, 29 August 2000, to be held at the Delta College <br /> administrative office at 9:00 AM. In addition, should it be necessary based on collected data and <br /> information, a meeting may be held during the week of 22 August 2000 to expedite the <br /> alternative water use. <br /> 5. Air and water sampling will be conducted within specific site buildings and at specific points in <br /> the irrigation supply system by Delta Environmental staff on Saturday, 20 August, or Sunday, <br /> California Environmental Protection Agency <br /> Zd Recycled Paper <br />