Laserfiche WebLink
08/01/01 15:01 FAX 209 942 A Siegfried Ens � C>�004 <br /> SPECIAL PROVISIONS <br /> 1.01 DESCRIPTION OF WORK <br /> A. The work to be performed shall consist of furnishing all labor, materials, tools, transportation, <br /> supplies, equipment, appurtenances,fuel, and power, unless specifically excepted, necessary or <br /> required for the demolition of the irrigation water well and appurtenant piping and the demolition of <br /> the test hole as shown on the plans and described in the specifications. <br /> 1.02 INSURANCE REQUIREMENTS <br /> A. Companies supplying insurance shall be admitted to supply such instruments within the State of <br /> California, shall be listed by the Office of the Insurance Commissioner, and shall have a minimum <br /> A.M. Best rating of A. <br /> B. Public Liability and Property Damage Insurance-The Contractor shall take out and maintain <br /> during the life of the project, Public Liability and Property Damage Insurance, in which the College <br /> shall be named as an additional insured, which will protect the Contractor, and or all <br /> Subcontractors, College and its agents or representatives, against any claims for personal injury, <br /> including accidental death as well as from the operation of the Contractor,whether such operation <br /> shall have been performed by the Contractor, any Subcontractor, or by anyone employed either <br /> directly or indirectly by any of them. <br /> The Public Liability and Property Damage Insurance shall be provided with the limits no less than <br /> the following: <br /> 1. Limit or Liability for injury or accidental death, $1,000,000 per occurrence. <br /> 2. Limit or Liability for Property Damage, $1,000,000 per occurrence. <br /> The Contractor shall furnish the College with satisfactory proof of the carrying of the required <br /> insurance by submitting certifications or policies of insurance to the Engineer, prior to the <br /> commencement of work under the Contract. Any work performed prior to the submission of such <br /> certification or policies shall be considered as having been done by him at his own risk and as a <br /> volunteer. <br /> 1.03 PROGRESS OF WORK&TIME FOR COMPLETION <br /> A. After the Work and Safety Plans been approved by the College, the Engineer will give the <br /> Contractor written Notice to Proceed. The Contractor shall commence work within five(5)days <br /> after the date of the written Notice to Proceed and shall diligently prosecute the work to <br /> completion. <br /> B. No work shall take place during the first two weeks of school, August 17 through September 4. If <br /> possible, road closures and destruction of the well should take place after 1:00 PM to allow for <br /> better traffic control. <br /> 1.04 PRE-CONSTRUCTION INSPECTION <br /> A. Prior to the commencement of work, a joint inspection between the Engineer, or his <br /> representative, and the Contractor's superintendent will be conducted to review the pre- <br /> construction conditions of the existing facilities in the vicinity of the project site. (e.g. roads, <br /> pumps, discharge pipes,siphons, ramps,gates, helicopter pads, signs, etc.) <br /> If such existing facilities are damaged by the Contractor's operations, the Contractor, at his <br /> expense, shall replace or restore them to the condition that existed prior to the commencement of <br /> work. <br /> 1.05 SITE DATA <br /> A. The approximate location of any utilities, irrigation pipes, etc., are shown on the plans for the <br /> information of the Contractor.The College assumes no responsibility for the accuracy, reliability, <br /> SPECIAL PROVISIONS-1 <br />