Laserfiche WebLink
08/01/01 15:01 FAX 209 942 010 Siegfried Eng • 11005 <br /> or location of this information. It is the responsibility of the Contractor to determine the actual <br /> location of all underground, surface,overhead, or facilities which may be subject to damage by <br /> reason of his operations. <br /> 1.06 PROTECTION OF FACILITIES <br /> A. The Contractor shall preserve and protect certain plants and trees as designated and marked by <br /> the Engineer.Where pruning and trimming of branches is required by the work,such pruning or <br /> trimming shall be done by approved methods. <br /> B. Protect all trees within the limits of work from damage. <br /> 1.07 FINAL INSPECTION <br /> A. Any deficiencies noted during interim and final inspections by the Engineer and/or College,shall <br /> be corrected by the Contractor prior to final acceptance by the College. Any additional costs and <br /> expenses for mobilization and/or demobilization, labor, equipment and other associated costs <br /> required to correct the deficiencies noted, except specified material(s), shall be bome by the <br /> Contractor. <br /> END OF SECTION <br /> R.01.8 <br /> SPECIAL PROVISIONS-2 <br />