My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/01/01 15:01 FAX 209 942 010 Siegfried Eng • 11005 <br /> or location of this information. It is the responsibility of the Contractor to determine the actual <br /> location of all underground, surface,overhead, or facilities which may be subject to damage by <br /> reason of his operations. <br /> 1.06 PROTECTION OF FACILITIES <br /> A. The Contractor shall preserve and protect certain plants and trees as designated and marked by <br /> the Engineer.Where pruning and trimming of branches is required by the work,such pruning or <br /> trimming shall be done by approved methods. <br /> B. Protect all trees within the limits of work from damage. <br /> 1.07 FINAL INSPECTION <br /> A. Any deficiencies noted during interim and final inspections by the Engineer and/or College,shall <br /> be corrected by the Contractor prior to final acceptance by the College. Any additional costs and <br /> expenses for mobilization and/or demobilization, labor, equipment and other associated costs <br /> required to correct the deficiencies noted, except specified material(s), shall be bome by the <br /> Contractor. <br /> END OF SECTION <br /> R.01.8 <br /> SPECIAL PROVISIONS-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.