My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/01/01 15:02 FAX 209 942 0� _ Siegfried Eng . Z007 <br /> SECTION 01540 <br /> SECURITY AND SAFETY <br /> PART 1 -GENERAL <br /> 1.01 DESCRIPTION <br /> A. This section describes the security and safety measures to be provided by the Contractor at <br /> all times until acceptance of the work by the College. <br /> 1.02 SECURITY <br /> A. Provide protection for materials, tools, and equipment being employed in the Project, including <br /> the tools of workers. The College shall not be held responsible for loss of, or any damage to, <br /> materials,tools, equipment, or personal belongings of the Contractor or of those employed by <br /> him, by contract or otherwise. <br /> 1.03 PROTECTION <br /> A. Continuously maintain protection as necessary to protect the work as a whale and in part, <br /> and adjacent property and improvements form accidents, injuries, or damage. <br /> B. The Contractor shall erect and maintain during the life of the work, a temporary construction <br /> fence around the work site to keep unauthorized personnel from entering the site and to keep <br /> his personnel from parking vehicles or placing materials and equipment outside the work site. <br /> C. Post and maintain guards around the work site to keep public a minimum of 75' away thirty <br /> minutes(30) prior to and ten(10)minutes after detonation of explosives. <br /> 1.04 CONTROL OF SITE <br /> A. The contractor shall ensure that no alcohol, firearm,weapon, or controlled substance enters <br /> or is used at the Project site. The Contractor shall immediately remove from the site and <br /> terminate the employment on any employee found in violation of this provision. <br /> B. The Contractor shall only park his equipment and vehicles in locations designated by the <br /> College. <br /> 1.05 TRAFFIC CONTROL <br /> A. Contractor shall comply with all applicable Federal,State, County and Local requirements as <br /> required for traffic control and public safety during project construction. Coordination with the <br /> proper agencies and the placement and maintenance of warning signs, lights and other traffic <br /> control devices, as may be required, shall be the responsibility of the Contractor. <br /> B. Temporary road closures to allow the Contractor's vehicles and equipment to enter the site <br /> will be allowed. The Contractor shall provide flaggers to control traffic. <br /> C. The Contractor shall advise the City of Stockton's fire department, across the street from the <br /> project site, twenty four(24) hours in advance of any road closures. <br /> D. During detonation of the explosive charges in the well, the entrance road east of the project <br /> site shall be closed. The Contractor shall detour northbound traffic on Burke Bradley Drive to <br /> the west at the intersection of the east and north roads, and shall prohibit south bound traffic <br /> from entering the campus via Yokuts for a period of ten (10) minutes prior, and thirty(30) <br /> minutes following detonation of explosive charges in the well. <br /> E. Coordinate traffic and road closures with the College's police chief. <br /> 01540-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.