My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/01/01 15:01 FAX 209 942 0t Siegfried Ent; . 006 <br /> SECTION 01020 <br /> WORK PLAN <br /> PART 1 -GENERAL <br /> 1.01 DESCRIPTION <br /> A. This Section describes the requirements for furnishing a work plan describing Contractor's <br /> approach and methods for prosecuting the work. <br /> 1.02 GENERAL <br /> A. It is expressly agreed that time is of the essence on this contract and that the Contractor <br /> agrees to perform the work within the time and in he manner specified, or within the time of <br /> such extensions as may be granted. <br /> 1.03 CONTRACTOR'S WORK PLAN <br /> A. The Contractor shall submit a work plan describing in detail his approach and methods for <br /> prosecuting work the in accordance with the construction documents. <br /> B. The work plan shall outline the means, methods, equipment, and personnel the Contractor <br /> intends to use to accomplish the work. The work plan shall indicate the timing and duration of <br /> construction operations. <br /> C. The Contractor's work plan shall include assistance that may be required from the College in <br /> operating its facilities such as, shutting down irrigation systems, operating valves, shutting <br /> water off, etc. The work plan shall include date and times shut down of services may be <br /> needed . <br /> D. The work plan shall indicate the area that the Contractor intends to use to perform the work <br /> and steps that will be taken to prevent damage to adjacent areas. <br /> E. If at any time after the approval of the work plan, the Contractor wishes to make any changes <br /> in the work plan, he shall submit a request to the Engineer for such changes; otherwise, he <br /> shall follow the work plan originally submitted and approved. <br /> 1.04 NOTIFICATION <br /> A. The Contractor shall notify the College a minimum of 24 hours in advance of commencing <br /> construction. <br /> B. The Contract shall notify the College 24 hours in advance of needing any shutdown of <br /> service. <br /> PART 2-PRODUCTS <br /> NOT USED <br /> PART 3-EXECUTION <br /> NOT USED <br /> END OF SECTION <br /> R.01.8 <br /> 01020-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.