Laserfiche WebLink
08/01/01 15:05 FAX 209 942 Ole Siegfried Eng • 121015 <br /> 3.07 CLEANING <br /> A. Upon completion of all work, all debris shall be removed and disposed of,the site shall be <br /> graded to a uniform slope to promote storm water drainage, and left in a neat, clean, <br /> condition. <br /> END OF SECTION <br /> R01-4 <br /> 02675 - 5 <br />