Laserfiche WebLink
Mike Infurna <br /> From: Marty Hartzell [HartzeM@rb5s.swrcb.ca.gov] <br /> Sent: Monday, February 25, 2002 7:23 AM <br /> To: sbright@environmentalauditinc.com; Mlnfurna@phs.hs.co.san-joaquin.ca.us; Cori Condon; <br /> wtnicker@unocal.com <br /> Subject: Re: Status Report CAO 5-00-707 <br /> Hello Steve, <br /> Thank you for the status report. With the SVE/AS startup of Unocal wells, Unocal/Wards is <br /> now in compliance with Order No. 10 of C&A Order 5-00-707, which requires the discharger <br /> to implement and continuously operate the approved remedial system. Other than scheduled <br /> short-term maintenance, please notify me of any shutdown of the remedial system. Marty <br /> Hartzell. 2/25/02 <br /> >>> "Steve Bright" <sbright@environmentalauditinc.com> 02/22/02 02:54PM >>> <br /> Wells at the Unocal site were connected to the remedial system on the <br /> Wards site as of Feb. 15, 2002. Shakedown of the system was completed <br /> between Feb. 19 and 20, and on Feb. 21, the system was placed in <br /> continuous operation, i.e. , air sparging plus vapor extraction for the <br /> Unocal and Ward sites. <br /> The test hole was completed and e-logged on Feb 21. The a-log has been <br /> provided to Delta College, who is working on the final well design with <br /> Clark Well and others. The final well design should be forwarded to the <br /> RWQCB and San Joaquin County PHS-EHD next week, along with the a-log. <br /> Have a nice weekend. <br /> Steve <br /> (714) 632-8521, ext. 224 <br /> 1 <br />