My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Message Page 1 of 1 <br /> Mike Infurna <br /> From: Steve Bright [sbright@environmentalauditinc.comj <br /> Sent: Friday, February 22, 2002 2:54 PM <br /> To: tguantone@sjdccd.cc.ca.us; Dan Watts; Cori Condon; dginter@dbsr.com; Gary H. Hall; Jay Allen; <br /> Marty Hartzell; Mike Infurna; Nick Nickerson <br /> Cc: Jill A. Tracy <br /> Subject: Status Report CAO 5-00-707 <br /> Wells at the Unocal site were connected to the remedial system on the Wards site as of Feb. 15, 2002. <br /> Shakedown of the system was completed between Feb. 19 and 20, and on Feb. 21, the system was placed in <br /> continuous operation, i.e., air sparging plus vapor extraction for the Unocal and Ward sites. <br /> The test hole was completed and e-logged on Feb 21. The a-log has been provided to Delta College,who is <br /> working on the final well design with Clark Well and others. The final well design should be forwarded to the <br /> RWQCB and San Joaquin County PHS-EHD next week, along with the a-log. <br /> Have a nice weekend. <br /> Steve <br /> (714)632-8521, ext. 224 <br /> 2/25/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.