Laserfiche WebLink
Sep 01 04 05: 11p GHiONGINEERING 5306-3108 p. 2 <br /> • Compare the laboratory analyses with the historical laboratory data <br /> from samples collected in MW-1 to determine if the well may have <br /> been impacted during the well box destruction <br /> • Prepare a letter report documenting the laboratory analytical results <br /> and the field observations <br /> • Replace well box lid <br /> If it is determined that the well has been impacted, an addendum will be submitted to redevelop <br /> the well to remove any impacted material. GHH can schedule the field activities within three <br /> working days after approval of the workplan by the Regional Board. <br /> If you have any questions or require additional information, please contact me at the <br /> (530) 886-3100. <br /> 5 <br /> Thank you/H. <br /> H"i:"ItlJL � <br /> � No. 919 � <br /> Gll, P.E.P 9�0FCRt\FeQ <br /> PC: Mr. Jay Allen, Stone Bros. Management Company (mail &fax 209-235-1521) <br /> Mr. Ben Heningburg, ENSR Corporation (mail& fax 916-362-8100) <br /> Mr. Mike Infurna, San Joaquin County ERD, Stockton(mail & fax 209-468-3433) <br /> F:\5 180\D E\GH\ln\W kpl nM W-1 090104 <br />