My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012724
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0012724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:44:05 PM
Creation date
4/2/2020 2:33:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012724
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vendors on the job site during the course of this investi- <br /> gation, comply with the provisions A this HASP, and the Federal <br /> Each sub-- <br /> occupational Safety and Health Act (see Mations which <br /> contractor is required to know the safetyreg <br /> apply to the work/operations. <br /> The EAI site Safety Officer (SSO) is responsible for the <br /> daily implementation of the health and safety program. The SSo <br /> itor safety <br /> will be on-site during assessment activities <br /> Priormto initiation <br /> and health and decontamination protocols- <br /> Manager (PM) or <br /> of site activities, the SSO, EAI Prof <br /> designee, will verify that site personnel have read, understood <br /> and agreed to the health and safety have the authority tolstop worklto <br /> The s50 and PM, individually, <br /> achieve compliance with this site HASP. <br /> 3.o FIELD WORK <br /> The planned field work to be completed as part of this <br /> investigation includes: <br /> - Establishing Exclusion, Decontamination and Clean <br /> Zones; <br /> - Drilling and sampling exploratory borings. <br /> conducting equipment and personnel decontamination. <br /> 4.0 HAZARD ASSESSMENT <br /> Information from a previous investigation conducted <br /> be encounteredthe <br /> site indicate that contaminants probably Y <br /> during assessment activities- Contaminants that <br /> reasonably <br /> be expected to beech encountered <br /> nzenee in leadclud . Appendix A contains <br /> toluene, xylenes, Y that may <br /> be <br /> general information on selected chemicals <br /> encoantered during this investigation. <br /> 4.1 Inhalation Hazdrd <br /> l be <br /> Respirators equipped with Organic vapor carand dgother es ll site <br /> available for use during drilling, sampling <br /> activities, should their use be warranted. Should chemicals be <br /> will not <br /> encountered at the site for thehSSOese Or PMrespwilOrimmediately <br /> offer sufficient protection, <br /> cease activities and determine the appropriate course of action. <br /> Project No. 1232 <br /> -2- <br /> F,NVIROVAIENTAL AUDIT,INC.,, <br /> a�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.