Laserfiche WebLink
' Health and Safety Plan <br /> Cleanup and Abatement Order No 5-00-707 EAI Prosect No 1232 <br /> • Preparing any accident report (see Section 13 2) <br /> r • Conducting safety meetings (see Section 9 1) <br /> • Ceasing Site operations, if necessary, in the event of an emergency or to correct unsafe <br /> work practices <br /> 2.3 Site Safety Officer <br /> The SSO's duties may be carried out by the PM or other qualified designee The SSO <br />' A Implements the HASP, and reports any deviations from the anticipated conditions <br /> described in the plan to the PM <br />' • Determines that monitoring equipment is properly used and is calibrated in accordance <br /> with the manufacturer's instructions or other standards <br /> Conducts Site safety meetings <br /> • Assumes any other duties (that the SSO is qualified to handle) as directed by the PM <br /> M • Provides review of the protection level needs as work is ongoing, and notifies the PM of <br /> requisite changes, if any <br />' + Ensures that decontamination procedures are followed (see Section 10 0) <br /> © Establishes monitoring of personnel and records results of exposure monitoring <br />' 2.4 Field Technicians <br /> The field technicians are responsible for complying with the HASP, notifying the SSO of <br /> hazardous or potentially hazardous conditions, and carrying out specialized tasks during field <br /> operations These tasks include inspecting, calibrating, maintaining, and using field equipment, <br /> performing Site characterization activities, maintaining decontamination stations, preparing and <br /> decontaminating sampling equipment, collecting and preserving samples, and packaging and <br /> shipping samples according to proper chain-of-custody procedures <br /> 2.`a i iciu T 2iui■ Si�2 <br /> The size of the field team is determined by the nature of the field activities, the characteristics <br /> of the Site, the safety hazards involved, and the prescribed levels of safety protection The field <br /> team must be large enough to ensure on-site activities are conducted safely, but not so large as <br /> 1 to sacrifice efficiency Generally, each task will employ a minimum of two team members <br /> 0 EA1 personnel will be present during all phases of the field activities <br /> 1 <br /> SAH 1232CAOHASP 4- <br /> ENVIRONMENTAL AUDIT, INC <br />