Laserfiche WebLink
tv ; <br /> Environmental Consultants 3711 Long Beach Boulevard 562 426 9544 <br /> Ninth Floor FAX 562 427 0805 <br /> Long Beach, CA 90807 3315 http //www scseng corn <br /> SCS ENGINEERS <br /> October 14, 1998 <br /> File No 0127898 <br /> Mr Mark B Gilmartin <br /> Montgomery Ward Company <br /> c/o Gilmartin & Le Berthon LLP <br /> 100 Wilshire Boulevard, Suite 1325 <br /> Santa Monica, California 90401-1114 <br /> SUBJECT Proposal for Corrective Action Plan Implementation <br /> Montgomery Ward Auto Center <br /> 5400 Pacific Avenue <br /> Stockton, California 95207 <br /> Dear Mr Gilmartin <br /> In response to your request of September 11, 1998, we are pleased to submit this bid to provide <br /> remedial design, construction, and monitoring services for implementation of a Corrective Action <br /> Plan (CAP) at the Montgomery Ward Auto Center, 5400 Pacific Avenue in Stockton, California <br /> The conceptual design for the Corrective Action Plan is outlined in a document prepared by <br /> Environmental Audit, Inc , dated July 6, 1998 The action consists of installing a groundwater air <br />• sparging and soil vapor extraction system to remove gasoline fuel hydrocarbon contamination It <br /> also includes 2 years of operation and maintenance of the system <br /> The CAP provides a conceptual design for soil and groundwater treatment We understand this <br /> request is for complete turnkey design/construct services to Implement the CAP as described <br /> This protect is subject to the State UST Fund approval SCS Engineers (SCS) is a licensed <br /> general engineering contractor as well as a nationwide design firm We are located close to <br /> Stockton and have considerable experience with similar projects <br /> SCOPE OF WORK <br /> Based on the information provided, we will perform the following tasks <br /> 1 Complete the Design - The design and specifications will be completed in sufficient detail to <br /> obtain air and building permits based on a turnkey design construction process <br /> 2 Permit the Systern - Permits for conctrLietion and oneratinn uidl he nhtnimarrl frnrn the City Of <br /> Stockton and San Joaquin Valley Unified Air Pollution Control District Utility clearance will be <br /> obtained and we will prepare a site specific Health & Safety Plan for the Installation and <br /> operation tasks <br /> 3 Well Installation - We will Install 8 dual phase vapor extraction/afr spargmg wells In <br /> accordance with detail shown on CAP Figure 15 and at the locations shown on Figure 12 <br /> 4 Trenching and Pipe Installation - We will Install 380 feet of 4" header pipe, 325 feet of 2" <br /> lateral pipe and 704 feet of 2" pressure piping to connect 15 well heads to the treatment <br /> system Our costs include materials, labor and equipment for trenching, backfilling, and <br /> asphalt restoration of the trench alignment <br /> Offices Nationwide <br />