Laserfiche WebLink
Mr Mark B Gilmartin <br /> October 14, 1998 <br /> Page 2 <br /> 5 Equipment Installation & Startup - Install a reconditioned Soil Vapor Extraction plus <br /> Catalytic Oxidation system In addition, we will install a blower for air sparging <br /> 6 Operation and Maintenance - Perform 2 years of routine operation and maintenance of the <br /> air sparging and soil vapor extraction system, including a weekly visit and the sampling of the <br /> air stream for permit compliance <br /> 7 Reporting - A startup report will be submitted within 60 days of startup and quarterly reports <br /> will be submitted thereafter for the 2-year period <br /> SCHEDULE <br /> Based on your authorization to proceed, we estimate that this project will be completed as outlined <br /> on the schedule below <br /> Task Description Duration <br /> Contracting 2 weeks <br /> 1 Permitting & Planning 3 weeks <br />• 2 Design 6 weeks <br /> 3 Well Installation 1 week <br /> 4 Trenching & Piping 2 weeks <br /> 5 Equipment & Startup 1 week <br /> 6 2-year O&M 2 years <br /> 7 Reports 2 years <br /> BID <br /> We will perform the scope of work outlined above on a fixed-fee basis for$316,000 A breakdown <br /> of costs Is as follows <br /> i <br /> Task Description Total <br /> 1 Permitting & Planning $ 9,100 <br /> 2 Design $ 11,200 <br /> 3 Well Installation $ 24,200 <br /> 4 Trenching & Piping $ 62,200 <br /> 5 Equipment & Startup $ 94,330 <br /> 6 2-year O&M $ 96,500 <br /> 7 Reports $ 18,600 <br /> GRAND TOTAL $316,000 <br />