My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012539
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0012539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:54:37 PM
Creation date
4/2/2020 4:26:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012539
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Mark B Gilmartin <br /> October 14, 1998 <br /> Page 2 <br /> 5 Equipment Installation & Startup - Install a reconditioned Soil Vapor Extraction plus <br /> Catalytic Oxidation system In addition, we will install a blower for air sparging <br /> 6 Operation and Maintenance - Perform 2 years of routine operation and maintenance of the <br /> air sparging and soil vapor extraction system, including a weekly visit and the sampling of the <br /> air stream for permit compliance <br /> 7 Reporting - A startup report will be submitted within 60 days of startup and quarterly reports <br /> will be submitted thereafter for the 2-year period <br /> SCHEDULE <br /> Based on your authorization to proceed, we estimate that this project will be completed as outlined <br /> on the schedule below <br /> Task Description Duration <br /> Contracting 2 weeks <br /> 1 Permitting & Planning 3 weeks <br />• 2 Design 6 weeks <br /> 3 Well Installation 1 week <br /> 4 Trenching & Piping 2 weeks <br /> 5 Equipment & Startup 1 week <br /> 6 2-year O&M 2 years <br /> 7 Reports 2 years <br /> BID <br /> We will perform the scope of work outlined above on a fixed-fee basis for$316,000 A breakdown <br /> of costs Is as follows <br /> i <br /> Task Description Total <br /> 1 Permitting & Planning $ 9,100 <br /> 2 Design $ 11,200 <br /> 3 Well Installation $ 24,200 <br /> 4 Trenching & Piping $ 62,200 <br /> 5 Equipment & Startup $ 94,330 <br /> 6 2-year O&M $ 96,500 <br /> 7 Reports $ 18,600 <br /> GRAND TOTAL $316,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.