Laserfiche WebLink
Mr Mark B Gilmartin <br /> October 14, 1998 <br /> Page 4 <br /> • Special safety and personal protection equipment, monitoring, testing, analysis, beyond <br /> hard-hat, shoes, glasses, and work-gloves (Level D) <br /> • Unapproved changes to contractor-furnished engineering design, methodology, materials, <br /> and equipment <br /> • Utility costs such as water, electricity, natural gas, etc <br /> • Operation manuals and spare parts <br /> • Construction delays caused by adverse weather conditions or other factors beyond SCS <br /> control The owner and UST fund should include a contingency budget of 10% of the <br /> above total costs for possible winter time construction delays, unknown factors not <br /> included in the cost summary provided above <br /> • Verification sampling and closure <br /> • Annual discharge permit fees <br /> CLOSURE <br /> SCS would like to take this opportunity to thank you for your consideration regarding this <br /> important project If you have any questions, please feel free to contact Lenard D Long, P E , our <br /> protect estimator in our Dublin, California, office, at (925) 829-0661, or the undersigned When <br /> you wish us to proceed, please contact us, and a contract will be provided for formal authorization <br /> to proceed <br /> Respectfully submitted, <br /> Anthon Jaggr, RG , CHG Kenneth V LaCond <br /> Project Director Vice President <br /> SCS ENGINEERS SCS ENGINEERS <br />