Laserfiche WebLink
Mr Mark B Gilmartin <br /> October 14, 1998 <br /> • Page 3 <br /> The total cost provided above may be reduced by $27,000 to $30,000, depending on the final <br /> design and sizing of the VES equipment <br /> Changes in work, if encountered, will be performed on a time and expense basis in accordance <br /> with our 1998 Fee Schedule plus 3% per year escalation cost We require a progress payment of <br /> $80,000 to be paid on the commencement date to cover the cost of treatment equipment and <br /> mayor material purchases The total cost provided above is based on our present knowledge of <br /> site conditions and is believed to be sufficient to substantially cover the work outlined in the CAP, <br /> however, since we did not provide first hand hydrogeologic or engineering interpretations of data <br /> regarding site conditions, no warranty is expressed or implied regarding the adequacy of the <br /> conceptual design provided by others <br /> Due to our resource demand, this quotation is valid for 30 days After that time, SCS reserves the <br /> right to reassess costs <br /> ASSUMPTIONS <br /> • Basis of estimate is the CAP provided Environmental Audit, Inc dated July 6, 1998 <br /> • All onsite utilities have sufficient capacity for blowers and motors (elect @200 amp, gas <br /> @ 135 cfh @ 3 psi) <br /> The facility will be closed during the three weeks of trenching and well installation <br /> • Reconditioned treatment equipment with a warranty is acceptable <br /> • Environmental Audit, Inc , will continue to provide groundwater monitoring and fund <br /> oversight consulting <br /> EXCLUSIONS <br /> It is recognized that this project is conceptual in nature without detailed engineering plans and <br /> specifications and that some modifications in the Scope of Work could be made in the future The <br /> following are excluded from this proposal <br /> • Construction bonds <br /> • Quarterly groundwater sampling, analysis, and reporting We can provide this service for <br /> an additional $78,000 (12 wells for 2 years), if requested <br /> • Noise abatement and treatment system remote telemetry <br /> • Disposal of any hydrocarbon impacted materials (soil and water), including costs to <br /> classify, manifest, or coordinate with regulators, haul or store, etc <br /> • Costs incurred either directly, subcontracted, or otherwise due to overtime requested by <br /> the client <br /> • Davis-Bacon or union wage <br />