Laserfiche WebLink
Well Completion Report `rKennedy/Jenks Consultatrts <br /> BoringlWell Name Add-itional Information <br /> ... Project Name <br /> Project Number <br /> START DATE FLASH DATE -- <br /> LOGGED BY - REVIEWED BY <br /> DIKING COMPANY <br /> EgJpM1ENT _ OR0.1ER <br /> O—INCH HOLLOW SEEM O _PICN-OFNERAUGER TOTAL HOURS DRILLED <br /> ❑_NCH ROTARY WAS" O _NCH RASING HAMMER <br /> GALLONS OF WATER - METHOD OF DECONTAMINATION <br /> USED DURING DRILLING <br /> Materials Used — <br /> SAND SACKS -- - - <br /> �. CEMENT SACKS _ <br /> WATER GALLONS -- <br /> FOMDEFIEDBEHFONRE SACKS .-- <br /> GROUT GALLONS <br /> BEMONRE PELLETS BI)CKETS: DID. <br /> BLANK CASING FEET <br /> SLOTTED CASING FEET UK SLOT£ZE <br /> STEEL ISOLATION CASING —_.._ FEET OIA. <br /> Omn <br /> OV <br /> CON PU PER OYES TREMIE USED? ❑YES SILT TRAP USED? ❑YTSUSE <br /> ONO I ONO I` FT- ONO <br /> T� <br /> WIELCOPLETKX O LOCKING STEEL WELL COVER <br /> ❑WELL NDl15RK'ENCLOSURE -- - <br /> O STAND PIPE <br /> Development <br /> DEPTH TO DEPTHTO TOTAL WATER <br /> ` WATER BEFORE WATBi AFTER REMOVED DURING <br /> DEVELOPMENT FT DEVELOPMEM DEVELOPMENT GAL . <br /> DEVELOPMENT DATE - TOTAL HOURS <br /> YIELD 11ME CONDUCTIVITY-T'C <br /> GPM FROM TO <br /> YIELD TIME CONDUCTIVITY-T'C <br /> GPM FROM TO <br /> YIELD TIME CONDUCFNIFY-T'C <br /> ` GPM FROM TO <br /> YELO TIME CODUCTTVIFY-T'C <br /> GPM FROM TO <br /> OFTURBIDRY 0CLEM aSUGHILY TURBID - <br /> ATENDOF <br /> DEVELOPMENT O MODERATELY Tom") O VERY TURBID <br /> WATER <br /> OSCNAR(iED 0GiK7VND SURFACE ❑TANK TRUCK - <br /> TO <br /> ❑STOIMA SEWER OSFORMaE TANK <br /> 0 DRUMS OOTHM <br /> FJ r14) <br />