Laserfiche WebLink
Kennedy/Jenks Consultants <br /> b. Temperature <br /> c. pH <br /> d. Specific conductance <br /> e. Depth to water <br /> f. Turbidity <br /> g. Color <br /> h. Other observations as appropriate (draw down in well during purge, presence of oil, odors) <br /> 4. For wells providing sufficient yield, continue purging until field parameters stabilize or at least <br /> _ three casing volumes are removed. Wells providing insufficient yield are purged dry once, <br /> allowed to recover to 80 percent of original water levels, and purged dry again. Wells with <br /> extremely low yields are purged dry only once. <br /> 5. Following purging, allow wells to recover to approximately 80 percent of original water levels <br /> and then collect samples. <br /> 6. Samples will typically be collected using clean bottom-employing bailers. Prior to sample <br /> collection, purge the bailer three times with water from the well. During sample collection, allow <br /> a 4- to 6-inch column of water to be purged from the bottom of the bailer before filling the <br /> appropriate sample containers. If the collected water is very turbid, or a bottom-emptying bailer <br /> is not used, carefully decant the water from the bailer into the appropriate sample containers. <br /> An attempt should be made to avoid agitation of the sample. <br /> 7. When multiple analyses will be performed, samples should be collected in order of decreasing <br /> sensitivity to volatilization (i.e., VOC samples first and metals last) <br /> 8. Collect groundwater samples using precleaned Teflon or stainless steel bailers, disposable <br /> bailer or precleaned Kemmerer (depth-specific) samplers. During sampling, record field <br /> parameters/observations as described in Step 3 on K/J form F-43. As required by anticipated <br /> analyses, label and fill containers according to the guidelines listed in Table C.1 <br /> 9. Ensure that each sample label documents sample, designation, type, date and time of <br /> collection, collector(s), location, and any additional information. <br /> 10. Complete chain-of-custody records and include them with the samples, which are to be <br /> transported to the laboratory in insulated containers at 4°C. <br /> 11. Each day, calibrate pH meters with buffer solutions and calibrate specific conductance meters <br /> using standard solutions. <br /> 4.4 Quality Control/Quality Assurance <br /> 1. Collect duplicate samples immediately after the original samples are collected. Purging is not <br /> performed between original sample collection and collection of duplicate samples. Original and <br /> duplicate samples are collected sequentially, without appreciable delay between collection <br /> Groundwater Protection Work Plan, The Wine Group SOG 4 <br /> Franzia Winery, Ripon, California 2 <br /> _ 9V'sy p�VWO303012002_xNreg,oupW0 pMUwAznlpp dice M4 amp.dx <br />