Laserfiche WebLink
K Kennedy Jenks <br /> The current WDR, issued in April 1995 and the revised MRP issued in April 2001, require <br /> monitoring of the groundwater beneath the Site. Current monitoring activities include measuring <br /> groundwater elevations on a quarterly basis and collecting samples for laboratory analysis on a <br /> quarterly and annual basis, depending on the parameter, from the three existing groundwater <br /> monitoring wells. Available analytical results are summarized in the quarterly reports. <br /> Monitoring Well Installation Work Plan, The Wine Group, Franzia Winery, Ripon, California Page 3 <br /> \\kjc.local\kjc-root\kj-offce\sfo\projects\is-proj\2026\2665002.00_twg ripon gw mon well support\09-reports\mwispUg ripon mon well install wp_020426.docx <br />