My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 4:26:55 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
17000 E STATE ROUTE 120 RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Johnnie Tucker <br /> California Regional Water Quality Control Board, Central Valley Region <br /> 13 January 2026 <br /> Page 2 <br /> Figure 1 : Groundwater Elevations at MW-3, MW-4, MW-5 <br /> 35 --- <br /> I • MW-3 <br /> -E 30 • • _ <br /> Q ♦ MW-4 <br /> aa) 25 - _. _.___._ <br /> LL <br /> 0 20 -i.. _�_. _ ....... MW-3 Well <br /> --Ij----- -- � ---- ----- ---- - ._E Screen Bottom <br /> ----- MW-4 Well <br /> ......•.... ♦. .♦ AI.Rl.f„ 'Rlll�#. , R •#,#J.# f •.R...J.#.J. J.S�J, LRI.R! .J.l,L!!.__ <br /> W 15 ""'' Screen Bottom <br /> i i <br /> — — —MW-5 Well <br /> ca 10 �, -- — -i--- _� - Screen Bottom <br /> - - — — - - <br /> 5 - <br /> I <br /> 0 <br /> The information summarized in this letter is intended to satisfy the requirement to submit a <br /> Groundwater Monitoring Network Evaluation Report. A Monitoring Well Installation Work Plan (MWISP) <br /> is being prepared for the replacement wells. The MWISP will include the following: <br /> • General site plan and proposed well locations <br /> • Proposed drilling methods <br /> • Proposed well construction and development techniques <br /> • Proposed survey needs <br /> • Initial well sampling plan in compliance with the Monitoring and Reporting Program (MRP) 95- <br /> 097. <br /> • Proposed time schedule for well installation <br /> The MWISP will be submitted to the CRWQCB in early February 2026, and well installation will be <br /> scheduled for late 2026. If you have any questions about this letter or the proposed plan, please let me <br /> know and we can schedule a call to discuss. <br /> Sincerely,.f�--- <br /> Ryan Dean <br /> General Manager, The Wine Group <br /> Enclosure: Attachment A—Groundwater Elevation Map, July 2025 <br /> cc: Brendan Kennny, CRWQCB <br /> Kyle Schmidt, The Wine Group <br /> Margaret Wild, Kennedy Jenks <br />
The URL can be used to link to this page
Your browser does not support the video tag.