Kennedy/Jenks Consultants <br /> The process water treatment portion of the study will evaluate the hydraulic characteristics and <br /> other qualities of the vineyard soils, identify potential treatment issues and mitigation measures, <br /> compare the results of the process water characterization to the results of the treatment <br /> evaluation, and identify and describe potential process water, salinity, and nitrate reduction, <br /> reuse, recycling, and treatment opportunities. <br /> 6.1.4 Report of Waste Discharge <br /> A Report of Waste Discharge is due to the CRWQCB on 1 April 2006, as specified in Item 6 of <br /> the CAO. The Report of Waste Discharge will include a Process Water System Improvement <br /> Plan and Final System Design, and a proposed schedule for implementation of the plan and <br /> design, as appropriate. <br /> The purpose of the Process Water System Improvement Plan (Plan) is to examine, compare, <br /> - and evaluate the process water, salinity, and nitrate reduction, reuse, recycling, and treatment <br /> opportunities. The Plan will also identify best management practices and best practicable <br /> treatment and control measures to be implemented to prevent groundwater degradation, and <br /> r contain the rationale for the improvement measures chosen. <br /> The purpose of the Final System Design is to present the design for the proposed process water <br /> system improvements that will protect groundwater beneath the site from degradation. <br /> 6.1.5 Quarterly Progress Reports <br /> As specified in Item 7 of the CAO, The Wine Group must submit quarterly progress reports <br /> describing the work accomplished to date. The progress reports are due the first day of the <br /> second month following the end of the quarter (i.e., by 1 February, 1 May, 1 August, and <br /> 1 November). The Second Quarter Report is due by 1 August 2004. <br /> 6.2 Timeline <br /> Schedules for completion of the work outlined in each individual work plan presented in this <br /> Groundwater Protection Work Plan were presented at the end of Chapters 2,3,4 and 5. Field <br /> work for the work plans will be coordinated where possible to conserve time and resources. <br /> A chronological summary of the schedules found in Chapters 2, 3, 4 and 5 is listed below. <br /> • 21 June 2004-Submit Groundwater Protection Work Plan including the Groundwater <br /> Characterization Work Plan, the Groundwater Monitoring Well Installation Work Plan, the <br /> Process Water Characterization Work Plan, and the Process Water Treatment Evaluation <br /> Work Plan <br /> • 16 July 2004- Prepare Health and Safety Plan <br /> .. • 16 July 2004 - Select a licensed drilling contractor <br /> • 16 July 2004 -Select a certified laboratory for all analytical work <br /> • 23 July 2004 - Perform underground utility survey <br /> — • 30 August 2004 - Finish monitoring well Installation <br /> • 1 October 2004- Submit Monitoring Well Installation Report to the CRWQCB <br /> Groundwater Protection Work Plan, The Wine Group Page 6-2 <br /> Franzia Winery, Ripon, California <br />