My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Appendix B: Standard Operating Guideline <br /> _ Reconnaissance Groundwater Sampling and Cone <br /> Penetration Testing Procedures <br /> 13.1 Introduction <br /> This guideline describes the equipment and procedures which will be used by Kennedy/Jenks <br /> Consultants personnel for collecting in situ soil resistance and friction data and reconnaissance <br /> groundwater samples. <br /> B.2 Equipment <br /> • Cone penetration testing (CPT)truck or CPT-adaptable drilling rig <br /> • Groundwater collection device <br /> • Hydropunch system <br /> • BAT system <br /> • Well-point system <br /> • Steam cleaner <br /> Water level probe <br /> • Trisodium phosphate (TSP) soap <br /> • 5-gallon buckets <br /> • Stiff-bristle brushes <br /> • Deionized water <br /> • Type II Portland cement <br /> • Sample containers/labels <br /> • Chain-of-custody forms <br /> • Personal protective equipment <br /> 6.3 Sampling Procedures <br /> 1. The CPT operator will calibrate and advance the CPT probe in accordance with ASTM <br /> Standard D 3441-86. <br /> 2. The CPT probe (approximately 2 inches in diameter)will be advanced at a consistent, <br /> controlled rate of 0.03 to 0.07 feet/second to the desired depth using the rig's hydraulic rams. <br /> 3. The probe will be advanced at a constant rate and measurements of cone tip resistance, sleeve <br /> friction resistance, pore pressure (if specified), and inclination will be made. <br /> 4. The field log will record depth, cone tip resistance, friction resistance, friction ratio, inclination, <br /> soil type, and pore pressure and pore pressure ratio (if measured). The field log will be provided <br /> to the field geologist/engineer for review before the rig is moved to another location. <br /> Groundwater Protection Work Plan, The Wine Group B-1 <br /> Franzia Winery, Ripon, California <br /> gtis pla0minWIOMW12002_win"pM0 pahlworlpIoWpa&CK ppbre ,td. <br />
The URL can be used to link to this page
Your browser does not support the video tag.