My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�,r V <br /> Kennedy/Jenks Consultants <br /> 5. Based on the CPT measurements, the groundwater collection device will be inserted into the <br /> existing hole or advanced at a separate location or to a separate depth with the CPT rig to <br /> collect a reconnaissance groundwater sample. <br /> 6. The groundwater samples will be collected in appropriate containers and labeled. The label will <br /> document the sample number, type, date and time of collection, sample collector(s), location, <br /> and any additional pertinent information. <br /> 7. After the CPT has been conducted and the groundwater sample collected, the sample holes will <br /> be grouted to ground surface with a neat cement grout using the tremie method. <br /> BA Equipment Cleaning <br /> 1. CPT equipment will be cleaned with TSP soap solution and rinsed with deionized water or <br /> steam cleaned prior to sampling and between each sampling location. <br /> 2. The groundwater collection device will be disassembled and cleaned with TSP solution and <br /> rinsed with deionized water or steam cleaned prior to each sampling location. The sampling <br /> device will be stored in a clean protective case when not in use to minimize atmospheric <br /> contamination. <br /> Groundwater Protection Work Plan, The Wine Group B-2 <br /> Franzia Winery, Ripon, California <br /> gVsywp�d F"61 M3012002_wi�ggjepMs rFWw%app�msW ppbr c PLU <br />
The URL can be used to link to this page
Your browser does not support the video tag.