Laserfiche WebLink
GENERAL NOTES: KITCHEN GENERAL NOTES: PLUMBING FIXTURE SCHEDULE: PLUMBING SYMBOLS <br /> 1. DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE 1. REFERENCE THE KITCHEN EQUIPMENT PLUMBING CONNECTION FIXTURES IN THIS SCHEDULE OR THEIR APPROVED EQUIVALENT <br /> GENERAL SCOPE OF THE WORK. PRIOR TO SUBMITTING BID, VISIT 14. CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO SCHEDULE FOR ITEMS TO BE FURNISHED AND / OR INSTALLED AS ARE PROVIDED BY THE PLUMBING CONTRACTOR. SUBMIT SHOP ANNOTATION <br /> THE JOB SITE TO OBSERVE THE EXISTING CONDITIONS OF THE TURNING BUILDING OVER TO THE OWNER. REQUIRED TO COMPLETE THE INSTALLATION OF PLUMBING DRAWINGS ON EACH OF THESE ITEMS. REFER TO <br /> PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND 15. PROVIDE TRAP PRIMERS WHERE REQUIRED BY LOCAL SYSTEMS FOR KITCHEN EQUIPMENT. REFERENCE KITCHEN SPECIFICATIONS FOR FURTHER INFORMATION AND INSTALLATION �1 PLUMBING PLAN NOTE CALLOUT ' <br /> PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE AUTHORITIES. EQUIPMENT DRAWINGS FOR THE EXACT LOCATION OF EQUIPMENT REQUIREMENTS. VERIFY ROUGH-IN REQUIREMENTS WITH v <br /> SPECIFICALLY CALLED OUT IN THIS PORTION OF THE AND ROUGH-IN. REFERENCE THE KITCHEN EQUIPMENT SHOP MANUFACTURER'S INSTALLATION INSTRUCTIONS AND INSTALL PER � PLUMBING EQUIPMENT DESIGNATION. (CONTRACTOR FURNISHED J <br /> CONSTRUCTION DOCUMENTS. NOTIFY OWNER'S CONSTRUCTION 16. COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DRAWINGS AND COORDINATE WITH THE OWNER FOR EXACT MANUFACTURER'S RECOMMENDATIONS. REFER TO THE L ' AND INSTALLED). REFER TO PLUMBING FIXTURE OR EQUIPMENT o c%j <br /> MANAGER OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO DO NOT INSTALL PIPING OVER ELECTRICAL PANELS. REQUIREMENTS PRIOR TO THE START OF INSTALLATION. ARCHITECTURAL DRAWINGS FOR THE PLUMBING FIXTURE SCHEDULES m <br /> SUBMISSION OF BID, MOUNTING HEIGHTS. cu m <br /> EQUIPMENT DESIGNATION (OWNER FURNISHED, CONTRACTOR Z E c <br /> 17. PAINT ALL EXPOSED GAS AND WATER PIPING USING RUST 2, PROVIDE ITEMS AND WORK AS REQUIRED FOR A COMPLETE AND INSTALLED, SEE KITCHEN EQUIPMENT SCHEDULE FOR o) o <br /> 2. PROVIDE A CONSTRUCTION RECORD SET OF "AS-BUILT" INHIBITOR PAINT. PAINT AND COLOR SHALL BE COORDINATED WORKING PLUMBING INSTALLATION FOR EACH PIECE OF KITCHEN AP ACCESS ,PANEL: JAY R. SMITH # 4762 -- 12" x 12" - CL, SPECIFICATIONS) O r _U� Q <br /> DOCUMENTS TO THE OWNER'S CONSTRUCTION MANAGER WITH THE ARCHITECT AND / OR OWNER. EQUIPMENT. PROVIDE ROUGH-INS AND CONNECT TO THE KITCHEN TYPE 304 STAINLESS STEEL PANEL AND FRAME WITH CONCEALED 18 JANITOR'S SINK: ZURN # Z-1996-24, 24" x 24" x 10" HIGH RTU MECHANICAL EQUIPMENT DESIGNATION CONTRACTOR FURNISHED y cn - <br /> REFLECTING ANY VARIANCES OF INSTALLED PIPING LOCATIONS EQUIPMENT WITH TRAPS, SUPPLIES, SHUTOFF VALVES, PIPES TO HINGE, KEY OPERATED CYLINDER LOCK. PROVIDE WITH NAILER TERRAZZO BASIN WITH INTEGRAL STAINLESS STEEL DRAIN BODY. ( 7 ccs as <br /> OR EQUIPMENT CONTRARY TO THE CONSTRUCTION DOCUMENTS, 18. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES. THE WALL, ESCUTCHEONS, ETC AS SHOWN, SPECIFIED AND SLOTS FOR INSTALLATION IN STUD WALLS AND ANCHOR STRAPS FAUCET ZURN MODEL # Z1996-SF, 8" CENTERSET, FAUCET WITH 1 AND INSTALLED UNLESS NOTED OTHERWISE) L � � <br /> REFER TO SPECIFICATIONS. MAINTAIN 10 MINIMUM CLEARANCE FROM ALL AIR INTAKES. REQUIRED. FOR INSTALLATION IN MASONRY CONSTRUCTION. WALL BRACE, INTEGRAL VACUUM BREAKER, PAIL HOOK AND 3/4" CONNECTION POINT OF NEW WORK TO EXISTING - <br /> MAINTAIN 2' CLEARANCE FROM ALL OTHER EQUIPMENT. MALE HOSE THREADED OUTLET. SECURE FAUCET IN WALL WITH U <br /> 3. PROVIDE TO THE OWNER'S CONSTRUCTION MANAGER A COPY OF 3. VERIFY GAS LOADS AND GAS ROUGH-IN OF KITCHEN EQUIPMENTBACKBOARD. <br /> INSPECTION REPORTS AND APPROVAL CERTIFICATES FROM 19. INSULATE PIPING ROUTED IN EXTERIOR BUILDING WALLS WITH WITH THE KITCHEN EQUIPMENT SHOP DRAWINGS PRIOR TO BFP PR T WATTS # 1 DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER w � <br /> LF009QT-S, LEAD FREE CAST BRONZE BODY, QUARTER TURN TEST TRIM: T-35 THREE FOOT LONG REINFORCED HOSE WITH O ►\ <br /> LOCAL AND STATE INSPECTIONS, REFER TO SPECIFICATIONS. INSTALLING GAS PIPING. PROVIDE GAS COCKS, UNIONS, ETC. AS 3/4" CHROME COUPLING AND WALL HOOK, # V-70 EXTRUDED VINYL P1 LOWER NUMBER INDICATES SHEET NUMBER 0y <br /> VERIFY EXISTING CONDITIONS. THE SUBMISSION OF A BID WILL BE COCKS, QUARTER TURN BALL VALVES, BRONZE STRAINER, AND # 909AG � � � <br /> SPECIFIED AND REQUIRED. INSTALL GAS QUICK DISCONNECTS BUMPER GUARD. <br /> MINIMUM 2" BATT INSULATION TO PREVENT FREEZING. AIR GAP FITTING. SHALL CONFORM TO ASSE 1022. ABBREVIATIONS Z a <br /> 4. INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED WHERE FURNISHED WITH THE KITCHEN EQUIPMENT. TMV THERMOSTATIC MIXING VALVE: POWERS # e480, SOLID W �.... cn q <br /> CODES AND THE REQUIREMENTS OF AUTHORITIES HAVING 20. EXAMINE THE CONTRACT DRAWINGS AND ALL AVAILABLE <br /> JURISDICTION AND ALSO MEET ALL REQUIREMENTS OF THE INFORMATION CONCERNING EXISTING INSTALLATION, STRUCTURE, 4. PROVIDE INDIRECT WASTE LINES OF SAME SIZE AS CONNECTION EXPANSION TANK: AMTRDL "THERM-X-TROL" # ST-5, BRASS BODY, THERMOSTATIC WAX ELEMENT, CORROSION AFF ABOVE FINISHED FLOOR MH MANHOLE °C <br /> LANDLORD. OBTAIN A COPY OF THE LANDLORD'S AND LOCAL CONDITIONS. VISIT THE SITE TO UNDERSTAND THE TO EQUIPMENT WITH 3/4" BEING MINIMUM SIZE. ROUTE FROM WELDED STEEL PRESSURE TANK, POLYPROPYLENE LINING, RESISTANT INTERNAL PARTS, AND INTEGRAL CHECKS, ASSE 1070 AFG ABOVE FINISHED GRADE MIN MINIMUM <br /> REQUIREMENTS AND REVIEW PRIOR TO SUBMITTING BID. NATURE AND SCOPE OF ALL WORK TO BE PERFORMED AND EQUIPMENT CONNECTION POINTS INDICATED TO FLOOR DRAIN OR FLEXIBLE BUTYL DIAPHRAGM, AIR CHARGING VALVE, 150 PSI COMPLIANT, CAPABLE OF 2.2 GPM WITH A 20 PSI DIFFERENTIAL AHU AIR HANDLING UNIT N/C NORMALLY CLOSED Z <br /> FLOOR SINK. PROVIDE AIR GAP OF TWO PIPE DIAMETERS MAXIMUM WORKING PRESSURE, 2.0 GALLON CAPACITY, 0.45 AND A MINIMUM FLOW RATE OF 0.5 GPM. SET TEMPERATURE TO BFF BELOW FINISHED FLOOR <br /> 5. PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED TAKEN AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MINIMUM PER CODE. MAXIMUM ACCEPTANCE FACTOR, 3/4" PIPE CONNECTION. SET THE 110F FOR DUEL TEMPERATURE LAVATORIES AND HAND SINKS,AIR CHARGE PRESSURE TO MATCH EXISTING WATER SYSTEM 100F FOR SINGLE TEMPERATURE LAVATORIES AND HAND SINKS BFP BELOW FINISHED GRADE ORD ORD NORMALLY OPEN OVERFLOW ROOF DRAIN W <br /> CODE REQUIREMENTS. MADE AND THAT ALL EXISTING CONDITIONS HAVE BEEN BOP BOTTOM OF PIPE <br /> CONSIDERED. NO ALLOWANCES WILL BE MADE AFTER THE 5. COMPLY WITH HEALTH DEPARTMENT REGULATIONS. PROVIDE PRESSURE. AND 120F FOR SINKS. MOUNT BELOW THE PLUMBING FIXTURE PDI PLUMBING DRAINAGE INSTITUTE <br /> 6. VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CLEARANCE FOR CLEANING BEHIND AND UNDER EXPOSED PIPING WHERE INDICATED ON PLAN(S). BOS BOTTOM OF STRUCTURE PVC POLYVINYL CHLORIDE <br /> CONNECTION BEFORE START OF PIPING INSTALLATION. CONDITIONS. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY AS REQUIRED BY HEALTH DEPARTMENT. CONFORM TO HEALTH FCO PVC FLOOR CLEANOUT; SIOUX CHIEF # 852 SERIES WITH BTU BRITISH THERMAL UNIT PRV PRESSURE REDUCING VALVE <br /> DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THAT DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS. SQUARE SCORIATED MEDIUM DUTY CAST NICKEL ADJUSTABLE TP TRAP PRIMER; PRECISION PLUMBING PRODUCTS # PR- CPUC CHLORINATED POLYVINYL RD ROOF DRAIN <br /> 7. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND TOP, IN UNFINISHED AREAS, WITH FLANGED PVC ADAPTER WITH 500 "PRIME RITE", CORROSION RESISTANT BRASS BODY, "0" RING CHLORIDE <br /> MOUNTING HEIGHTS OF PLUMBING FIXTURES. OF THESE DRAWINGS PRIOR TO BEGINNING CONSTRUCTION. BLANK TRAP PRIMER PORT AND POLYPROPYLENE THREADED SEALS, 1 2" INLET AND OUTLET, AND INTEGRAL VACUUM BREAKER. RPM REVOLUTIONS PER MINUTE <br /> 6. PROVIDE AIRTIGHT SEAL AROUND PIPING PENETRATIONS / DN Dowry RTU ROOFTOP UNIT <br /> "WITH INSTALL WINSTALL THE VALVE AT A MINIMUM OF 12ABOVE FINISHED FLOOR. <br /> INSERT.S IN . I <br /> $. DO NOT SCALE FLOOR PLANS FOR EXACT HORIZONTAL LOCATION 21. PLUMBING CONTRACTOR MUST PROVIDE CAMERA VERIFICATION THROUGH WALK-IN COOLER OR FREEZER WALLS OR CEILINGS. PLASTIC PLUG WITH THREADED BRASDFU DRAINAGE FIXTURE UNIT SF SQUARE FEET, SUPPLY FAN FREPRODUCTION <br /> GISANINSTRUMENTOF <br /> OF PIPE ROUTING. OF EXACT LOCATION OF WASTE LINE TO GC DURING BID. CARPET MARKER IN CARPETED FLOOR AREAS. CLEAN AND PROVIDE WITH DISTRIBUTION # DU-2 FOR TWO, # DU-3 FOR THREE, D5 DOWNSPOUT ASSUCHSHALLREMAIN <br /> VERIFICATION MUST BE MADE PRIOR TO ISSUANCE OF PERMIT 7. DO NOT INSTALL PIPING IN COOLER OR FREEZER WALLS. INSTALL POLISH TOP AFTER INSTALLATION WHERE EXPOSED. REFER TO OR # DU-4 FOR FOUR DRAIN CONNECTIONS. SP SUMP PUMP RTYOFNEPr13NEDEs�GN <br /> 9. INSTALL CONCEALED PIPING TIGHT TO THE STRUCTURE AND AS SPECIFICATIONS FOR INSTALLATION. ETR EXISTING TO REMAIN SS STAINLESS STEEL, SANITARY GROUPUNAUTHORIZEDUSEpF <br /> AND AFTER ACCEPTANCE OF CONTRACT TO PROCEED. EXPOSED PIPING IN A NEAT APPEARING MANNER. ION WITHOUT PERMISSIONHIGH AS POSSIBLE. INSTALL EXPOSED PIPING TIGHT TO THE Ewc ELECTRIC WATER COOLER SEWER, SAIL STACK HiTECTISPROHie,TTEo.WCO WALL CLEANOUT: SIOUX CHIEF 873 SERIES, BRASS ING IS ONLY FOR USE IN <br /> STRUCTURE, WALL OR CEILING AND A5 HIGH AS POSSIBLE. 22, CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC WATER $, COORDINATE FLOOR DRAIN LOCATION AND FLOOR SLOPE FD EI,,,OOR DRAIN: ZURN # FD-2320-NH3-ST--P, CAST IRON # FD FLOOR DRAIN TDH TOTAL DYNAMIC HEAD <br /> " COUNTERSUNK PWG, 20 GAUGE STAINLESS STEEL COVER AND CONNECTION*THTHISPROJECTAND <br /> COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS. SYSTEM IS PROVIDED WITH A REDUCED PRESSURE BACKFLOW REQUIREMENTS WITH THE ARCHITECT. BODY AND CLAMPING COLLAR, ADJUSTABLE 6 SQUARE NICKEL FFA FROM FLOOR ABOVE TFA TO FLOOR ABOVE SHALL NOT BE USED FOR OTHER <br /> BRONZE STRAINER. USE PUSH-ON JOINT OF OUTLET SIZE AS SCREW. CLEANOUT TEE TO BE PROVIDED SEPARATELY. REFER LOCATlONS.COPYRIG'IT2017 <br /> 10, VALVES SHALL BE LINE SIZE UNLESS OTHERWISE NOTED. PREVENTER RPBP). IF NOT EXISTING, PROVIDE AN APPROVED FFB FROM FLOOR BELOW TFB TO FLOOR BELOW <br /> RPBP ASSEMBLY SIZED TO MATCH BUILDING WATER METER. 9, INSTALL RIM OF FLOOR DRAINS AND FLOOR SINKS BELOW SHOWN ON PLANS. TO SPECIFICATIONS FOR INSTALLATION. FF FINISHED FLOOR <br /> 11, PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; INSTALL NEW RPBP BETWEEN THE WATER METER AND THE FINISHED FLOOR LEVEL. SLOPE FLOOR TO DRAINS. REFER TO TYP TYPICAL <br /> FS FLOOR SINK: ZURN FD2375, 6 DEEP CAST IRON BODY WHA WATER HAMMER ARRESTER: PRECISION PLUMBING Fl Flow UNE UL UNDERWRITERS LABORATORIES, <br /> EXPOSED PIPING, WHERE NECESSARY, SHALL BE ROUTED AS BUILDING PER LOCAL JURISDICTION'S REQUIREMENTS. ARCHITECTURAL DRAWINGS FOR EXACT LOCATION. # PRODUCTS, HARD DRAWN COPPER BODY WITH WROUGHT FLA FULL LOAD AMPS <br /> HIGH AS POSSIBLE AND TIGHT TO WALLS. WITH ACID RESISTING ENAMELED INTERIOR, ANCHOR FLANGE WITH INC. <br /> 10. COORDINATE LOCATION OF VENT, WATER, AND GAS PIPING TO SEEPAGE HOLES, CLAMP COLLAR, ABS DOME STRAINER, NICKEL COPPER FITTINGS, PISTON TYPE WITH LUBRICATED EPDM "0" RING FLR FLOOR UNO UNLESS NOTED OTHERWISE <br /> 12. COORDINATE ALL WORK WITH OTHER TRADES AND AVOID CONFLICT WITH OTHER TRADES. BRONZE RIM AND HALF/FULL GRATE. USE CAULK JOINT OF SEALS, MEETING ASSE 1010 OR PD1 WH-201. PROVIDE PDI SIZES GPM GALLONS PER MINUTE UPS UNINTERRUPTIBLE POWER SUPPLY <br /> CONTRACTORS. OUTLET SIZE A5 SHOWN ON PLANS. "A" THROUGH F' AS SHOWN ON PLANS. PROVIDE SIZE "A" UNLESS HD HEAD, HUB DRAIN V VOLT(S) F <br /> SH <br /> OWN OTHERWISE ON THE PLANS. IE INVERT ELEVATION13. COORDINATE PIPING INSTALLATION WITW STRUCTURAL GRADE 11. CLEAN INSTALLED PLUMBING FIXTURES AND EQUIPMENT. VCP VITRIFIED CLAY PIPE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVE PIPING LV Y�AL,L-MOUNTED LAVATORY (ADA ACCESSIBLE) AMERICAN IN wC INCHES OF WATER COLUMN ,� VENT STACKTHROUGH GRADE BEAMS, FOOTING, ETC. WHERE REQUIRED AND 12. PROVIDE WALL BACKING OR SPECIFIED CARRIERS FOR THE STANDARD # 0355.012 "LUCERNE" 20-1/2" X 18-1/4 RECTANGULAR WALL WC FLOOR-MOUNTED WATER CLOSET (ADA ACCESSIBLE); <br /> JB JUNCTION BOX <br /> AS NOTED ON PLANS. COORDINATE SLEEVE INSTALLATIONS WITH PROPER SUPPORT OF INSTALLED WALL HUNG FIXTURES AND MOUNTED WHITE VITREOUS CHINA FIXTURE WITH FAUCET LEDGE AND AMERICAN STANDARD # 3043.001 "MADERA" WHITE VITREOUS CHINA VTR VENT THROUGH ROOF <br /> J-BOX JUNCTION BOX [''n <br /> THE ARCHITECT, STRUCTURAL ENGINEER, STRUCTURAL EQUIPMENT. FRONT OVERFLOW. FIXTURE WITH ELONGATED UNIVERSAL BOWL AND DIRECT-FED SIPHON w/ WITH V) M <br /> kW KILOWATT <br /> CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE IS FAUCET: PROVIDE WITH SLOAN # ETF-600-LT 4" CENTERSET, JET ACTION. LOW CONSUMPTION TYPE AND MEETS DEFINITION FOR HIGH W/O WITHOUT <br /> INSTALLED. 13. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOT HARD WIRED, SENSOR OPERATED FAUCET LESS TRANSFORMER WITH EFFICIENCY TOILET (HET). MAU MAKE-UP AIR UNIT W <br /> "Y" STRAINER FILTERED SOLENOID VALVE AND 0.5 GPM AERATOR. WC WATER COLUMN <br /> AND COLD WATER SUPPLIES FOR 3-COMPARTMENT SINKS, PRE- VALVE: SLOAN "SLOAN" # 1 1 1-1.28 1.28 GALLON PER FLUSH, MAX MAXIMUM � <br /> IM; <br /> WS WASTE STACK Q <br /> RINSE UNITS, JANITOR SINKS, MIXING HOSE BIBBS & MIXING WALL TRMcGUIRE # 155A GRID DRAIN WITH TAILPIECE, McGUIRE EXPOSED CHROME-PLATED DIAPHRAGM TYPE FLUSH VALVE WITH MBH 1600 BTU PER HOUR Q <br /> HYDRANTS DOWNSTREAM OF SHUTOFF VALVES. # 2165CCLK LOOSE KEY COMPRESSION ANGLE STOP VALVES WITH CHLORAMINE RESISTANT DIAPHRAGM AND PROTECTED ORIFICE, wSFU WATER SUPPLY FIXTURE UNIT V <br /> W <br /> RISERS AND ESCUTCHEONS, McGUIRE # B8872CF 1-1/4" 17 GAUGE CAST OSCILLATING ADA COMPLIANT HANDLE, ESCUTCHEON, INTEGRAL u Q <br /> FIXTURE BRANCH CONNECTION SCHEDULE CHROME PLATED BRASS ADJUSTABLE P-TRAP AND WASTE ARM WITH SCREWDRIVER STOP WITH VANDAL RESISTANT CAP, VACUUM BREAKER, <br /> CLEANOUT PWG AND ESCUTCHEON, CONCEALED ARM CARRIER WITH AND SWEAT ADAPTER KIT. INSTALL FLUSH VALVE HANDLE ON THE WIDE PIPIN cWc W <br /> STANCHIONS TO FLOOR, PLUMBEREX "PRO-EXTREME" # X-4222 SIDE OF THE STALL. - DOMESTIC COLD WATER (CW) G C- <br /> FIXTURE COLD WATER HOT WATER WASTE VENT INSULATION KIT FOR WATER AND WASTE PIPES. TRAM: CHURCH # 950QSSC WHITE OPEN-FRONT CONTOURED, CC <br /> SOLID PLASTIC, HEAVY DUTY, SEAT LESS COVER WITH SELF-SUSTAINING -- DOMESTIC HOT WATER (HW) C Q <br /> WATER CLOSET(VALVE) 1-114" -- 4" 2" DCV DUAL CHECK VALVE WITH ATMOSPHERIC PORT: WATTSCHECK HINGES AND STAINLESS STEEL BOLTS. 0 <br /> # SD-3, T TRAP PRIMER LINE (T} <br /> 316 STAINLESS STEEL BODY, ASSE 1022 COMPLIANT, 3/8" INLET AND V <br /> LAVATORY 1I2" 112" 2" 2" OUTLET, ATMOSPHERIC PORT, AND WYE PATTERN STRAINER. S 501E PIPING - ABOVE FLOOR {S} 0 <br /> JANITOR'S SINK 314" 314" 3" 2" --S-- SOIL PIPING - BELOW FLOOR (S) <br /> FLOOR SINK -- -- 3" 2" W WASTE PIPING - ABOVE FLOOR (W) <br /> FLOOR DRAIN 2" 2" <br /> W-- WASTE PIPING - BELOW FLOOR (W) <br /> -- -- <br /> GW GREASE WASTE - ABOVE FLOOR (GW) <br /> NOTES: _ - <br /> -GW---- GREASE WASTE - BELOW FLOOR (GW) <br /> PIPE SIZES SHOWN ARE MINIMUM. -- - -VBG---- VENT BELOW GRADE (VBG) <br /> GREASE INTERCEPTOR SIZING LOW PRESSURE GAS 1 -VBF---- - VENT BELOW FLOOR (VBF) <br /> TOTAL CONNECTED NATURAL GAS LOAD WATER AND WASTE FIXTURE COUNT FIXTURE TYPE GW GW PIPE SIZING CHART CD CONDENSATE DRAIN (CD) d <br /> QTY D.F.0 D.F.U. PIPE G NATURAL GAS (G) <br /> KITCHEN EQUIPMENT DF.U. TOTAL HOT COLD COMBINE TOTAL TOTAL TOTAL (EA) TOTAL LOAD (CFH) <br /> FIXTURE TYPE new QTY (EA) D.F.U. S.F.U. S.F.U. S.F.U. S.F.U. S.F.U. SERVICE SIZE EXISTING PIPING TO REMAIN o <br /> (EA) (EA) (EA) (HOT) (COLD) S.F.U. SERVICE SINK(MOP BASIN) 1 3.0 3.0 - - <br /> �� - -V- - - - VENT PIPING (V) <br /> EQUIPMENT SINK(HAND)(2"DW) 2 2.0 4.0 112 34 0 4 <br /> LAVATORY 2 1.0 2.0 0.75 0.75 1.00 1.5 1.5 2.D <br /> DESIGNATION DESCRIPTION CFH (EACH) SERVICE SINK(MOP BASIN) 1 3.0 3.0 2.25 2.25 3.00 2.25 2.25 3.0 SINK(2 COMPARTMENT)(2" IW) 1 3.0 3.0 314" 72 ® SQUARE FLOOR DRAIN (FS) SIZE & TYPE <br /> SINK(3 COMPARTMENT)(2" IW) 1 4.0 4.0 ® ROUND FLOOR DRAIN (FD), SIZE & TYPE <br /> 24 FRYER 1 D� FLOOR DRAIN 5 2.0 10.0 0.00 0.00 0.00 0 0 0.0 2" FLOOR DRAIN IN GREASE PRODUCING AREA 3 2.0 6.0 1" 135 <br /> WATER CLOSET(1.28 GPF FLUSH VALVE) 2 4.0 8.0 0.00 2.50 2.50 0 5 5.0 HOT FOOL?TABLE (3/4" IW) 1 0.5 0.5 -- -----�=� BALL VALVE <br /> 24 FRYER 100 DIPPER WELL(314"IW) 1 0.5 0.5 1-1I4" 278 CONTROL VALVE O <br /> SPECIALTY KITCHEN EQUIP. ESTIMATED TOTAL GREASE WASTE DRAINAGE FIXTURE UNITS: 21.0 1-112" 416 <br /> 23 RANGE 227 SHUTOFF VALVE <br /> SINK(HAND)(2" DW) 2 2.0 4.0 1.50 1.50 2.00 3 3 4,0 PER TABLE 1014.3.6 OF THE 2016 CPC, 25 DFU CAN BE p s <br /> 25 GRI DDLE 219 SINK(2-COMPARTMENT)(2" IW) 1 3.0 3.0 1.50 150 2.00 1.5 1.5 2.0 PLUMBED TO AN EXISTING 3,000 GALLON GREASE INTERCEPTOR 2„ 802 CHECK VALVE g <br /> SINK(3 COMPARTMENT)(2" IW) 1 4.0 4.0 3.00 3.00 4.00 3 3 4A2-1/2" 1,278 �I� UNION � Po <br /> 22 RICE COOKER 35 ICE MACHINE(314" IW) 2 0.5 1.0 0.00 0.50 0.50 0 1 1.0 <br /> Number of DFU's 21.0 <br /> SODA MACHINE (314"IW) 2 D.5 1.0 O.OD 1.00 1.00 0 2 2.0 OPERATING PRESSURE OF 7"WC WITH A � CAP <br /> 22 RICE COOKER 35 0-II WALL CLEANOUT (WCO) <br /> TEA MAKER(314"IW) 2 0.5 1.0 0.00 0.50 0.50 0 1 1.D TABLE 1014.3.6 PRESSURE DROP OF 0.5"WC <br /> 45 GRIDDLE 110 HOT FOOD TABLE (314"1W) 1 0.5 0.5 0.75 0.75 1.00 0.75 0.75 1.0 GRAVITY GREASE INTERCEPTOR SIZING O FLOOR CLEANOUT (FCO) d <br /> DIPPER WELL{314" IW) 2 4.5 1.0 0.00 0.75 0.75 0 1.5 1.5 TOTAL DEVELOPED LENGTH= 200 FEETTOTAL = 826 ® EXTERIOR CLEANOUT (ECO) <br /> DFU"s(1) INTERCEPTOR VOLUME (2) TOTAL CONNECTED LOAD = 1016 CFH ELBOW UP <br /> MECHANICAL EQUIPMENT TOTAL UNITS: 23 38.5 12.00 22 50 26.50 BASED ON 2016 CPC TABLE 1216.2 1 <br /> 8 500 gallons +� ELBOW DOWN <br /> EQUIPMENT 21 (3) 750 gallons TEE UP O <br /> DESIGNATION DESCRIPTION CFM (EACH) 35 1,000 gallons <br /> WATER PIPE SIZING CHART 90(3) 1,250 gallons TEE DOWN <br /> WH-1 WATER HEATER 50 FIXTURE UNITS VS. PRESSURE LOSS 172 1,500 gallons ELBOW UP WITH SHUT-OFF VALVE (SOV) <br /> IN PSI 1 100 FEET FOR TYPE "L" COPPER TUBE 216 2,000 gallons ----�--+� ELBOW DOWN WITH SHUT-OFF VALVE (SOV) <br /> RTU-1(EXISTING) ROOF TOP UNIT 125 COLD WATER 6 PSI 1 100' HOT WATER 6.0 PSI 1 100' TEE UP WITH SHUT-OFF VALVE (sdv) <br /> RTU-2(EXISTING) ROOF TOP UNIT 125 PIPE FLUSH TANK FLUSH VALVE VELOCITY FLOW FLUSH TANK VELOCITY FLOW TEE DOWN WITH SHUT-OFF VALVE (SOV) <br /> TOTAL = 300 SIZE SFU SFU FEET/ SEC GPM SFU FEET/ SEC GPM "A" WATER HAMMER ARRESTER (WHA) <br /> 112" 2.4 NIA 3.6 2.7 <br /> 314" 7.9 WA 4.6 6.9 * * WITH PDI SIZES, A, B, C. D, & E <br /> + GAS COCK DATE: 10.17.2018 <br /> TOTAL CONNECTED LOAD = 1126 1" 19.8 NIA 5.4 13.9 17.8 5 12.9 61 TRAP PRIMER REVISION <br /> 1-114" 40.5 7.5 6.3 24.5 29.2 5 19.5 <br /> 1-112" 79.5 26.3 6.9 38.3 47.5 5 27.5 6-0-- TRAP PRIMER WITH DISTRIBUTION UNIT Q <br /> NATURAL GAS SYSTEM OPERATING PRESSURE OF 7 INCHES WC 2" 1 250 137 1 8.0 1 77.3 120 5 48.2 1 <br /> NATURAL GAS SYSTEM SIZED WITH TOTAL DEVELOPED LENGTH FROM GAS METER TO SIZED WITH HAZEN WILLIAMS CONSTANT"C = 135" * UTILIZE COLD WATER SIZING CHART <br /> 2 <br /> MOST REMOTE PIECE OF EQUIPMENT OF 200' WITH PRESSURE DROP OF 0.5 INCHES W.C. I KITCHEN FIXTURE CONNECTION SCHEDULE <br /> PLUMBING PIPE MATERIAL SCHEDULE HOT COLD WASTE <br /> TAG# FIXTURE/EQUIPMENT WATER WATER VENT NOTES <br /> PIPING SYSTEM ABBREVIATION PIPING MATERIAL (IN.) (IN.) INDIRECT DIRECT <br /> SANITARY DRAINAGE & VENT(ABOVE GRADE) S, W OR V HUBLESS CAST IRON 4 ICE TEA DISPENSER 112" 314" BFP, FILTERED WATER, TO FS <br /> SANITARY DRAINAGE & VENT(BELOW GRADE) S, W OR V PVC DWV 6 BEVERAGE DISPENSER 1/2" 314" BFP, FILTERED WATER, TO FS <br /> ui r <br /> POTABLE WATER (ABOVE GRADE) CW, HW OR HWR TYPE L HARD DRAWN COPPER WITH SOLDERED JOINTS 12 WALL MOUNTED HANDSINK 112" 112" 2" 2" 36618 A <br /> POTABLE WATER -2" & SMALLER (BELOW GRADE) CW, HW OR HWR TYPE K SOFT ANNEALED COPPER 15 3-COMPARTMENT FAUCET SINK 314" 314" (3)2" 12" SWING SPOUT <br /> NATURAL GAS ABOVE GRADE & ON ROOF) G SCHEDULE 40 BLACK STEEL 16 2-COMPARTMENT FAUCET SINK 112" 112" 1 2" 12" SWING SPOUT, TO FS WATER HEATER SCHEDULE 0 <br /> FA1V�G�oQ`'�o�� <br /> NATURAL GAS (BELOW GRADE) G APPROVED'PE' PIPE FOR GAS 18 MOP SINK AND FAUCET 314" 314" 3" 2" INTEGRAL VACUUM BREAKER MANUFACTURER/ AREA TANK SIZE RECOVERY ENERGY <br /> CONDENSATE DRAIN- 1" & SMALLER CD TYPE M HARD DRAWN COPPER 28 3-WELL WARMERS 112" 314" BFP, TO FS MARK MODEL# SERVED ENERGY SOURCE (GALLONS) INPUT 80 DEGREE RISE FACTOR NOTES <br /> PLUMBING <br /> CONDENSATE DRAIN - 1-114" & LARGER CD TYPE DWV HARD DRAWN COPPER ## CARBONATOR 112" DCV, FILTERED WATER WH-1 BRADFORD WHITE 1ULG2PDV50H503N KITCHEN/ LAVS NATURAL GAS 48 50 MBH 60 0.68 A, B SCHEDULES & <br /> INDIRECT DRAIN - 1"& SMALLER ID TYPE M HARD DRAWN COPPER 29 DIPPER WELS 112" 314" TO FS NOTES: NOTES <br /> INDIRECT DRAIN - 1-114" & LARGER !D TYPE DWV HARD DRAWN COPPER 37 BAG-N-BOX SODA SYSTEM 4" PVC CONDUIT A. 80F TEMPERATURE RISE WITH 140F OPERATING TEMPERATURE. <br /> 52 BEVERAGE DISPENSER 314" DRAIN TO FS B. FURNISH WITH FACTORY COMBUSTION AIR INTAKE AND EXHAUST KIT <br /> REFER TO SPECIFICATIONS FOR FITTINGS, INSTALLATION REQUIREMENTS AND FURTHER INFORMATION <br /> 53 ICE MACHINE 112" 314" BFP, FILTERED WATER, TO FS <br />